In Short : Union Minister Shri Pralhad Joshi visited Agartala, Tripura (Dec 28-29, 2024), reviewing central schemes like PMGKAY and PM-KUSUM. He announced plans to double FCI’s storage capacity in Tripura and lauded solar energy advancements, now at 20.5 MW. His review of renewable energy initiatives highlighted enhanced agricultural productivity and infrastructure development in the […]
NTPC Vidyut Vyapar Nigam Limited Issue Tender for Supply of 2 MW (AC) Grid Connected Solar PV Project at Tripura Airport, Agartala. For more information please see below link:
TERC permits the Petitioner to install 2 MW Solar Power Plant in phase-I for Agartala Airport, as per technical specifications submitted by them to this Commission. The Commission has a Power to Relax under Part F – Clause 18 of TERC (Net metering for grid interactive rooftop solar systems) Regulations 2016, and this Commission may […]
Design, Supply, Installation, Testing and Commissioning of Grid Interactive roof top solar power generation system of 5 KWp at CPWD office Ushabazar, Agartala For more information please see below link:
Design, Supply, Installation, Testing and Commissioning of Grid Interactive roof top solar power generation system of 5 KWp at CPWD office Gandhigram, Agartala For more information please see below link:
Design, Supply, Installation, Testing and Commissioning of Grid Interactive roof top solar power generation system of 5 KWp at CPWD office Gandhigram, Agartala For more information please see below link: