Petition for approval of tariff of NTPC Auraiya Gas Based Power Station 663.36 MW NTPC Limited – EQ Mag May 31, 2023 Anand Gupta 000 Policy & Regulation Petition for approval of tariff of NTPC Auraiya Gas Based Power Station 663.36 MW NTPC Limited. For more information please see below link: Read more Petition for Adoption of Tariff for setting up of 1200 MW ISTS Connected Wind-Solar Hybrid Power Projects (HYBRID-3) in India by the Ministry of Power – EQ