In the Matter of Approval the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations under System Strengthening Scheme in Northern Region–XXXVII (NRSS-XXXVII) – EQ

Summary: — **Key Dates & Delays** – **Asset-1:** SCOD – 19.12.2019, COD – 4.12.2022 → **Time overrun: 1081 days** – **Asset-2:** COD claimed as 5.1.2023 → Delay due to unready downstream asset by PTCUL. – **Asset-3:** COD claimed as 5.1.2023 → Delay due to washed-out bridge preventing reactor relocation. **PGCIL’s Claims** – **Asset-2:** COD claimed […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ

In the matter of Approval the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for determination of transmission tariff from COD under TSA with Mundra Ultra Mega Power Project – EQ

Summary: — # **1. Scope of Work** The bidder must execute the *complete* EPC + long-term O&M responsibility for: ### **🔹 10 MW Rooftop Solar PV System (Jodhpur District)** * Installation on multiple State Government office buildings, institutional buildings, and other public structures. * Project includes design, engineering, supply, installation, net-metering, commissioning, and maintenance for […]

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ