Summary: — **Case Background:** The petition was filed by **Power Grid Corporation of India Limited (PGCIL)** before the Central Electricity Regulatory Commission (CERC). The petition seeks determination of **transmission tariff for the 2024–29 tariff period** for assets under the project: *”Transmission Network Expansion in Gujarat to increase ATC from ISTS, Part-B”* in the Western Region. […]