Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Badarpur Thermal Power Station (705 MW). NTPC Limited – EQ Mag Pro April 8, 2022 Anand Gupta 000 Policy & Regulation Petition for truing up of annual fixed charges for the 2014-19 tariff period in respect of the Badarpur Thermal Power Station (705 MW). NTPC Limited. For more information please see below link: Read more In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination of transmission tariff for “Combined Asset under System Strengthening XIX scheme” in the Southern Region – EQ