1. Home
  2. Tag "CAPTIVE GENERATING PLANT"

Seeking comments on draft amendments proposed in Rule 3 (i.e, Requirements of Captive Generating Plant) of Electricity Rules, 2005 –reg – EQ

Summary: — ### **Key Proposed Amendments:** #### **1. Definition of Ownership and Captive User:** – **Ownership** now explicitly includes equity share capital held directly or indirectly through **subsidiaries, holding companies, and their subsidiaries**. – **Captive user** is defined to include end-users consuming electricity directly or through an **Energy Storage System**. – **Special Purpose Vehicles (SPVs)** […]

Greener Solar Manufacturing Could Prevent 8.2 Billion Tonnes of Carbon Emissions by 2035 – EQ

Seeking comments on draft amendments proposed in Rule 3 (i.e Requirements of Captive Generating Plant) of Electricity Rules, 2005-reg. – EQ

Summary: # What this draft does (at a glance) * Seeks public comments on proposed changes to **Rule 3: Requirements of Captive Generating Plant** under the Electricity Rules, 2005. Letter of transmittal is from the Ministry of Power (Under Secretary), addressed to industry bodies and experts. *(p.1)* * Draft is titled **Electricity (Second Amendment) Rules, […]

Greener Solar Manufacturing Could Prevent 8.2 Billion Tonnes of Carbon Emissions by 2035 – EQ

IN REGARD TO: PURCHASE OF SURPLUS POWER BY WBSEDCL FROM WASTE BASED CAPTIVE GENERATING PLANT (CGP) OF CAPACITY 16 MW OF AMPL 

IN REGARD TO THE APPLICATION SUBMITTED BY WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR APPROVAL OF POWER PURCHASE AGREEMENT EXECUTED ON 24.01.2019 BETWEEN M/S ANKIT METAL AND POWER LIMITED (AMPL) AND THE WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED (WBSEDCL) FOR PURCHASE OF SURPLUS POWER BY WBSEDCL FROM WASTE BASED CAPTIVE GENERATING PLANT […]

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission Licence and other related matters) Regulations to Vindhyachal Varanasi Transmission Ltd – EQ