1. Home
  2. Tag "Commission"

Commission for Air Quality Management in NCR and Adjoining Areas revokes Stage-I of GRAP in the entire NCR with immediate effect – EQ

In Short – The Commission for Air Quality Management in NCR and Adjoining Areas has, with immediate effect, lifted Stage-I of the Graded Response Action Plan (GRAP) across the entire NCR. In Detail : Today at 4PM, Delhi’s average Air Quality Index (AQI) clocked 159 as per the AQI Bulletin provided by the Central Pollution […]

Gujarat Green Hydrogen Project Policy 2025 – EQ

Seeking indulgence of the Commission and permission for extension of the period for completion of the Hero Solar Generation Switchyard

  Petition under Section 79(1)(f) along with Section 79(1)(k) of the Electricity Act, 2003 read with Regulations 32 and 33A of the Central Electricity Regulatory Commission (Grant of Connectivity, Long Term Access in inter-State Transmission and Related Matters) Regulations, 2009 seeking indulgence of the Commission and permission for extension of the period for completion of […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

MERC Rules in Favor of Avaada Energy for Delay in Signing PPA

MERC Rules in Favor of  Avaada Energy for Delay in Signing PPA Case of Avaada Energy Pvt. Ltd. seeking issuance of appropriate Order(s)/ directions(s) to MSEDCL inter alia executing the power purchase agreement pursuant to the adoption of tariff by the Commission vide its Order dated 15 May 2020 and letter of award dated 17 […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

KERC: Amount Due to reimburse by appropriate increase in tariff per unit taking into consideration the minimum contracted energy in PPA

ORDER a) The petitions are partly allowed. b) The petitioner and the respondent in each of the cases shall verify the amount payable to the Petitioner in the respective cases after examining the documents and other directions given in para 48 & 54 above. This process shall be completed within a period of two months […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets

  Tamil Nadu Energy Development Agency (TEDA)/ To accord approval for the proposed implementation of the KUSUM (Component C) Agricultural Solar Pump Scheme in 20,000 pump sets with 7.5 H.P load by installing 11 kW solar PV plant in each of the pump sets. ORDER 1. Prayer of the Petitioner in M.P. No.2 of 2020:- […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ