Petition of the GERC (Conduct of Business) Regulations for extension of time period for commissioning of the Project – EQ

Summary: — ## **1. Parties** ### **Petitioner:** **German Green Steel and Power Limited**, Ahmedabad **Represented by:** Ld. Adv. Ms. Ayushi Saxena ### **Respondent:** **Gujarat Energy Transmission Corporation Ltd. (GETCO)**, Vadodara **Represented by:** Mr. Shobhraj Jaiswal — ## **2. Nature of the Petition** Filed under: * **Sections 86(1)(c), (e), (f)** of the Electricity Act, 2003 * […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

PSB issue Tender for Commissioning, O&M of Grid Rooftop Solar PV Power Plant at Punjab Sind Bank Staff Training College, Institution Area, Sector 3, Rohini – EQ

Summary: — **Tender Reference:** PSB/HO/PREMISES/TENDER/04/2025-26 **Issuing Authority:** Punjab & Sind Bank (Premises Department) Corporate Office, NBCC Tower, East Kidwai Nagar, New Delhi. **Project Objective:** To install and maintain a 185 kW rooftop solar power plant under a turnkey EPC contract to promote renewable energy, reduce electricity costs, and ensure sustainable operations at the Staff Training […]

REIL issue Tender for SDSETC and Comprehensive O&M for 25Y of 10 MW Grid Connected Rooftop Solar PV Power Project on State Govt buildings State Govt undertaking buildings in Raj – EQ

Shree Cement Expands Green Footprint with 20 MW Solar Power Commissioning in Uttar Pradesh – EQ

In Short : Shree Cement has commissioned a 20 MW solar power plant in Uttar Pradesh, further strengthening its renewable energy portfolio. The project aligns with the company’s sustainability goals and commitment to reducing carbon emissions. This initiative will help meet a significant portion of its power needs through clean energy, supporting India’s transition toward […]

Diamond Power Secures ₹7.47 Billion Transmission Cable Order from Adani Green – EQ

Loom Solar Announces Strategic Expansion into Utility-Scale Solar Sector with the Commissioning of Four Utility-Scale Solar Power Plants – EQ

Commissioned 8 MW utility-scale solar power plant in Tamil Nadu, 5.3 MW in Madhya Pradesh, 1.1 MW plant in Uttarakhand; 3.5 MW Rajasthan New Delhi – Loom Solar, India’s fastest-growing bootstrapped solar energy solutions and a leading solar tech start-up, today announced its strategic expansion into Utility-Scale Solar sector, with the successful commissioning of 8 […]

IFC INVESTS ~US$ 50 MILLION IN GFCL EV FOR INDIA’s FIRST INTEGRATED BATTERY MATERIALS FACILITY – EQ

Petition of the GERC (Conduct of Business) Regulation of the evacuation infrastructure till the commissioning of the entire capacity of 40 MW of Wind Power Project – EQ

Summary: — # ⚖️ Case Details * **Forum:** GERC, Gandhinagar. * **Petition No.:** 2504 of 2025 + IA No. 52 of 2025. * **Petitioner:** *Sarjan Realties Pvt. Ltd.*, Pune. * Counsel: Ld. Adv. Aditya Singh. * **Respondent:** *Gujarat Energy Transmission Corp. Ltd. (GETCO)*. * Counsel: Ld. Adv. Aneesh Bajaj with Mr. Shobhraj Jayswal. * **Coram:** […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the GERC (Conduct of Business) Regulations for commissioning of the entire capacity of 25 MW of Wind-Solar Hybrid Power to Intra-State Transmission System – EQ

Summary: — ## **Case Summary – OPWIND Energy Pvt. Ltd. vs. GETCO** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2472 of 2025 **Order Date:** 19 July 2025 **Coram:** * Mehul M. Gandhi, Member * S.R. Pandey, Member — ### **1. Case Background** * **Petitioner:** M/s. OPWIND Energy Pvt. Ltd. * Counsel: Adv. Vineet […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

SAEL Industries Energizes Rajasthan with 298 MW Solar Project Commissioning – EQ

In Short : SAEL Industries Ltd. has commissioned its 298 MW (DC) solar project in Jalore, Rajasthan, ahead of schedule. Developed via subsidiary Sunfree Energy RJP1 Pvt Ltd, the plant spans over 1,000 acres and uses advanced locally-made TOPCon modules with 22.95% efficiency. Under a 25-year PPA with RUVITL at ₹2.61/kWh, this marks SAEL’s largest […]

Diamond Power Secures ₹7.47 Billion Transmission Cable Order from Adani Green – EQ

Petition of GERC (Conduct of Business) Regulations for commissioning of 4 MW AC Solar Power Project at District- Bharuch – EQ

Summary: — ## **Gujarat Electricity Regulatory Commission (GERC) – Daily Order** ### 📌 Case Details * **Petition No.:** 2479 of 2025 * **Petitioner:** *M/s. Shree Ganesh Enterprise* (Proprietor: Mr. Jaydip M. Patel) * **Respondents:** 1. Gujarat Energy Transmission Corporation Ltd. (GETCO) 2. Gujarat Urja Vikas Nigam Ltd. (GUVNL) 3. Dakshin Gujarat Vij Company Ltd. (DGVCL) […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the Electricity Act for extension of date of grid connectivity and commissioning of 7.8 MW solar plant – EQ

Summary: — ## **Case Summary – Panara Craft LLP vs. DGVCL & GETCO** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2488 of 2025 **Interlocutory Application (IA):** No. 41 of 2025 in Petition No. 2488 **Order Date:** 02 August 2025 **Coram:** * Mehul M. Gandhi, Member * S.R. Pandey, Member — ### **1. Case […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the GERC (Conduct of Business) Regulations for commissioning of the Project capacity allocated due to occurrence of unforeseen and uncontrollable events – EQ

Summary: — ## **Daily Order – Petition No. 2517 of 2025** **Issued by:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Date of Order:** 04 August 2025 — ### **Case Title** **Petitioner / Applicant:** Bhathwari Technologies Limited, Surat, Gujarat **Respondent:** Gujarat Energy Transmission Corporation Ltd. (GETCO), Vadodara **Interlocutory Applications:** * **IA No. 62 of 2025:** Urgent listing […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ