In the Matter of Approval the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations under System Strengthening Scheme in Northern Region–XXXVII (NRSS-XXXVII) – EQ

Summary: — **Key Dates & Delays** – **Asset-1:** SCOD – 19.12.2019, COD – 4.12.2022 → **Time overrun: 1081 days** – **Asset-2:** COD claimed as 5.1.2023 → Delay due to unready downstream asset by PTCUL. – **Asset-3:** COD claimed as 5.1.2023 → Delay due to washed-out bridge preventing reactor relocation. **PGCIL’s Claims** – **Asset-2:** COD claimed […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

In the matter of Approval the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for determination of transmission tariff from COD under TSA with Mundra Ultra Mega Power Project – EQ

Summary: — # **1. Scope of Work** The bidder must execute the *complete* EPC + long-term O&M responsibility for: ### **🔹 10 MW Rooftop Solar PV System (Jodhpur District)** * Installation on multiple State Government office buildings, institutional buildings, and other public structures. * Project includes design, engineering, supply, installation, net-metering, commissioning, and maintenance for […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition for Truing up and determination of the transmission tariff of the CERC (Conduct of Business) ans (Terms and Conditions of Tariff) Regulations for Phase-II generation projects in Odisha” in the Eastern region – EQ

Summary: — ## **1. Nature of the Petition** The petition has been filed by **Power Grid Corporation of India Limited (PGCIL)** seeking: 1. **Truing-up** of transmission tariff for the period **2019–24**. 2. **Determination of tariff** for the next control period **2024–29**. The assets involved belong to the **“Common Transmission System for Phase-II Generation Projects in […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) under “Gazuwaka HVDC back to back project” in the Southern Region – EQ

Summary: — ## 📋 **Case Overview** – **Petition No.**: 495/TT/2025 – **Petitioner**: Power Grid Corporation of India Limited (PGCIL) – **Subject**: – Truing up of transmission tariff for **2019–24** – Determination of transmission tariff for **2024–29** – Assets involved: – **Asset-1**: 400 kV Joypore-Gazuwaka transmission line with bays – **Asset-2**: 500 MW HVDC back-to-back stations […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the CERC (Conduct of Business) Regulations for review of the Order – EQ

Summary: —- **Parties:** – **Petitioner:** Power Grid Corporation of India Limited (POWERGRID) – **Respondents:** Bihar State Power Holding Company Limited (BSPHCL) and 5 Others **Subject:** Review Petition filed under **Section 94(1)(f) of the Electricity Act, 2003** read with **Regulation 52 of CERC (Conduct of Business) Regulations, 2023**, seeking review of the **Order dated 13.6.2025** passed […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations, Delhi Transco Limited for determination of transmission tariff – EQ

Summary: —- **Case Overview:** * **Petition No.:** 175/TT/2017 * **Jurisdiction:** Central Electricity Regulatory Commission (CERC), New Delhi. * **Petitioner:** Delhi Transco Limited (DTL). * **Main Respondents:** Power Grid Corporation of India Limited (PGCIL) and Others. * **Subject:** Determination of transmission tariff for the 2014-19 period. **Background & Current Status:** * This is a **remanded case** […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition for determination of tariff for “Eastern Region Expansion Scheme – XXVIII (ERES-XXVIII)” of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations – EQ

Summary: — #### **1. Overview and Context** * **Venue:** Central Electricity Regulatory Commission (CERC), New Delhi. * **Presiding Members:** A bench of four members, chaired by Shri Jishnu Barua. * **Common Petitioner:** All five petitions were filed by **Power Grid Corporation of India Limited (PGCIL)**, the central transmission utility. * **Core Subject:** All petitions seek […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff for “Eastern Region Strengthening Scheme-VII (ERSS-VII)” – EQ

Summary: — # **1. Overview of Petitions Heard Together** CERC conducted a combined hearing for **five tariff petitions** filed by **Power Grid Corporation of India Ltd. (PGCIL)** for **truing-up of existing tariffs (2019–24)** and **approval of new tariffs (2024–29)** under various regional transmission schemes. ### The petitions relate to the following schemes: ### **Eastern Region** […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of NERSSV in the North Eastern Region – EQ

Summary: — ## **1. Case Overview** Power Grid Corporation of India Ltd. (PGCIL) filed **Petition No. 151/TT/2025** under: * **Section 62** read with **Section 79(1)(d)** of the Electricity Act, 2003 * **Regulations 15(1)(a) & 23** of CERC (Conduct of Business) Regulations, 2023 * **CERC Tariff Regulations 2019 & 2024** ### **Purpose of the Petition** 1. […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the Electricity Act of the Code of Civil Procedure for the CERC (Conduct of Business) Regulations, 2023 – EQ

Summary: — ## **1. Background** POWERGRID filed **Review Petition No. 12/RP/2025** under Section 94(1)(f) of the Electricity Act, read with **Order 47 Rule 1 of the CPC** and Regulation 52 of CERC (Conduct of Business) Regulations, 2023. The petition seeks review of the Commission’s earlier order dated **1 May 2025** in **Petition No. 132/TT/2023** regarding […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ