Petition for determination of the capital cost and transmission tariff for Warangal New Substation Transmission System constructed, maintained and operated by Warora Kurnool Transmission Limited – EQ

Summary: — ## **Case Summary – WKTL (Warangal New 765 kV Substation Spare Reactor)** **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi **Petition No.:** 102/TT/2025 **Date of Hearing:** 19 August 2025 **Coram:** * Jishnu Barua, Chairperson * Ramesh Babu V., Member * Harish Dudani, Member * Ravinder Singh Dhillon, Member — ### **1. Case Background** […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) for Truing up and determination of the transmission tariff at the Vapi Sub-station in the Western Region – EQ

Petition for determination of the capital cost and transmission tariff at Warangal New Substation Transmission System constructed, maintained and operated – EQ

Summary: — ## **Case Summary – Warora Kurnool Transmission Ltd. (WKTL)** **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi **Petition No.:** 102/TT/2025 **Date of Hearing:** 19 August 2025 **Coram:** * Jishnu Barua, Chairperson * Ramesh Babu V., Member * Harish Dudani, Member * Ravinder Singh Dhillon, Member — ### **1. Case Background** * **Petitioner:** Warora […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) for Truing up and determination of the transmission tariff at the Vapi Sub-station in the Western Region – EQ

Rooftop solar plants constructed in 12,500 households in Tripura so far: Power Min – EQ

In Short : The Power Ministry announced that 12,500 households in Tripura have installed rooftop solar plants so far, promoting clean energy adoption in the state. The initiative aims to reduce dependency on conventional power sources, lower electricity costs for residents, and support India’s renewable energy targets. The project also contributes to sustainable development and […]

₹7,280 Crore Rare Earth Magnet Scheme Advances as Centre Prepares RfP to Strengthen Strategic Manufacturing – EQ