1. Home
  2. Tag "CTUIL"

Draft Procedure for Approval of Change in Renewable Energy Source(s) for Projects with Granted Connectivity – EQ

Summary: — ### 1. Regulatory Intent & Business Objective * CTUIL has introduced a formal mechanism to **allow renewable energy developers to change their declared energy source** (Solar, Wind, Hybrid, with/without ESS) **without altering the approved connectivity capacity**. * The move provides **commercial flexibility** to developers responding to market conditions, PPA requirements, technology evolution, or […]

KPI Green Energy Limited Successfully Energises 965 MWp Capacity out of its 2.17 GWp Independent Power Producer (IPP) Portfolio – EQ

Petition has been filed, inter-alia, seeking direction against Respondent No.1, CTUIL to extend the start date of Long-Term Access (LTA) as sought by the Petitioner (AEPL) and Anr – EQ Mag Pro

Petition has been filed, inter-alia, seeking direction against Respondent No.1, CTUIL to extend the start date of Long-Term Access (LTA) as sought by the Petitioner (AEPL) and Anr. For more information please see below link:

In the matter for the Adoption of Transmission Charges to Transmission System by the SR WR Power Transmission Limited – EQ

CONNECTIVITY AND OPEN ACCESS APPLICATIONS OF CTUIL INTEGRATED THROUGH NATIONAL SINGLE WINDOW SYSTEM (NSWS) – EQ Mag Pro

ENABLES SINGLE POINT APPROVALS FOR INVESTORS, ENTREPRENEURS AND BUSINESSES INTEGRATION MADE LIVE FROM MIDNIGHT OF 6TH JUNE Central Transmission Utility of India Limited (CTUIL) has successfully integrated filing of Applications for grant of Connectivity, Long Term Access and Medium-Term Open Access to Inter State Transmission System (ISTS) in India as well as to Participating Entities […]

Uttar Pradesh Cabinet Approves Gorakhpur Solar City Plan, Clears 20 MW Floating Solar Project – EQ