Approval of ‘Detailed Procedure for Connectivity and GNA’ under Regulation 39.1 of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 – EQ Mag Pro October 15, 2022 Anand Gupta 000 Policy & Regulation Approval of ‘Detailed Procedure for Connectivity and GNA’ under Regulation 39.1 of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022. For more information please see below link: Read more Petition for Truing up and determination of transmission tariff for Raipur Pooling Station (Powergrid) for Raipur PS (Powergrid)-Rajnandgaon for Chhattisgarh IPPs (Part-B)” in the Western Region – EQ