Petition for Adoption of Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with ESS with “Greenshoe Option” – EQ May 24, 2025 Anand Gupta 000 Policy & Regulation Petition for Adoption of Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with ESS with “Greenshoe Option” For more information please see below link: Read more Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing-up and determination of transmission tariff for the transmission system constructed – EQ