1. Home
  2. Tag "Distribution System"

Petition for Truing up of the transmission tariff for the Existing Transmission and Distribution System – EQ

Summary: — ## **Case Overview** * **Petitioner:** Damodar Valley Corporation (DVC). * **Respondents:** West Bengal State Electricity Distribution Co. Ltd. (WBSEDCL) & Jharkhand Bijlee Vitran Nigam Ltd. (JBVNL). * **Petition No.:** 655/TT/2025. * **Subject:** *Truing up of transmission tariff for the 2019–24 period* for the **existing Transmission & Distribution System (excluding 400 kV lines)**. — […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Existing Transmission and Distribution System – EQ

Summary: — ## 📌 Case Overview * **Petitioner:** Damodar Valley Corporation (DVC) * **Respondents:** WBSEDCL (West Bengal State Electricity Distribution Co. Ltd.), JBVNL (Jharkhand Bijlee Vitran Nigam Ltd.) * **Subject:** Petition under Sections 62 & 79 of the Electricity Act, 2003, seeking **truing up of transmission tariff for FY 2019-20 to FY 2023-24** for DVC’s […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition for Truing up of transmission elements and Distribution System (Series-1, Series-2 and Series-3) – EQ

Summary: — ## **CERC – Record of Proceedings** **Petition No.:** 410/TT/2025 **Date of Hearing:** 12.08.2025 **Petitioner:** Damodar Valley Corporation (DVC) **Respondents:** West Bengal State Electricity Distribution Company Ltd. (WBSEDCL) & Anr. **Coram:** * Shri Jishnu Barua (Chairperson) * Shri Ramesh Babu V. (Member) * Shri Harish Dudani (Member) * Shri Ravinder Singh Dhillon (Member) — […]

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Petition of HERC (Terms and conditions for grant of connectivity and open access for intra-State transmission and distribution system) Regulations, 2012 – EQ

Petition of HERC (Terms and conditions for grant of connectivity and open access for intra-State transmission and distribution system) Regulations, 2012 For more information please see below link:

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Arunachal Dy CM reviews strengthening of power transmission, distribution system – EQ

In Short : Arunachal Pradesh’s Deputy CM, Chowna Mein, reviewed efforts to strengthen the state’s power transmission and distribution system. Emphasizing the need for a robust infrastructure, he highlighted ongoing hydropower projects. Successful commissioning of key projects like the Niglok Sub-station and Oyan Sub-station marked progress. Mein urged faster implementation and close coordination between authorities […]

India’s Clean Energy Momentum Strengthens Through States, C&I Demand, and Rooftop Solar Expansion – EQ

Detailed procedure for Grid Connectivity to the Distribution system and filing of consent with open access application-comments invited – EQ Mag Pro

Detailed procedure for Grid Connectivity to the Distribution system and filing of consent with open access application-comments invited. For more information please see below link:

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ