Eastern Railway issue tender for Supply OF ON GRID SOLAR PLANT OF TOTAL CAPACITY 225 KWp THROUGH SOLAR POWER DEVELOPER UNDER PPP MODEL PHASE-II For more information please see below link:
Eastern Railway issue Tender for Supply OF ON GRID SOLAR PLANT OF TOTAL CAPACITY 100KWp THROUGH SOLAR POWER DEVELOPER UNDER PPP MODEL PHASE-I For more information please see below link:
Eastern Railway Issue Tender for Supply of 3 MW on grid roof top solar power plant under PPP model at different location. For more information please see below link:
Eastern Railway Issue Tender for Supply of 1 MW grid connected roof-top Solar Photo Voltaic Modules at Sealdah Division. For more information please see below link:
In an endeavour to minimize dependence on fossil fuels and to become Carbon Neutral Railway, the Eastern Railway is striving hard to generate green energy more & more by installing solar plants all over its jurisdiction. In a step forward to achieve the target of Zero Carbon Emission, Eastern Railway’s Jamalpur Workshop has finalised the […]
Kolkata: In an effort to minimise carbonfootprint and contribute towards reduction in global warming,the Eastern Railway on Friday said it has set an ambitiousplan to generate solar power of 300 million watts (30megawatt) by 2020. Aiming at maximum possible use of clean and renewableenergy within the zone, the Eastern Railway (ER) has set arapid growth […]