1. Home
  2. Tag "Energy Storage Systems"

Petition of the Guidelines for Tariff from Grid connected Renewable Energy Power Projects with Energy Storage Systems for seeking approval of deviations – EQ

Summary: — **1. Case Details:** – **Petition No.:** 2533 of 2025 – **Petitioner:** Torrent Power Limited (TPL) – **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar – **Coram:** Chairman Pankaj Joshi and Member Hiren Shah – **Date of Order:** 08/01/2026 – **Date of Hearing:** 06/01/2026 **2. Purpose of Petition:** – Filed under **Section 63 read with […]

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Petition for the Adoption for procurement of power from the 760 MW Grid Connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Summary: — **Background & Objective** – NTPC filed a petition under **Section 63 of the Electricity Act, 2003** for adoption of tariffs discovered through a **competitive bidding process**. – The tender was for procurement of **760 MW** of **Firm and Dispatchable Power (Assured Peak Power Supply)** from **ISTS-connected renewable energy projects with energy storage systems**. […]

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Petition of the Guidelines for Tariff from Grid connected Renewable Energy Power Projects with Energy Storage Systems – EQ

Summary: — # ⚖️ Case Details * **Forum:** Gujarat Electricity Regulatory Commission (GERC). * **Petition No.:** 2533 of 2025. * **Petitioner:** Torrent Power Limited (represented by Mr. Jignesh Langalia & Ms. Luna Pal). * **Coram:** Mehul M. Gandhi & S. R. Pandey (Members). * **Date of Order:** 29.08.2025. — # 📑 Subject Matter * Petition […]

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Petition for the Adoption of Tariff of 760 MW Firm and Dispatchable Power (APPS) from ISTS Connected Renewable Energy Power Projects with Energy Storage Systems, Ministry of Power, Government of India – EQ

Petition for the Adoption of Tariff of 760 MW Firm and Dispatchable Power (APPS) from ISTS Connected Renewable Energy Power Projects with Energy Storage Systems, Ministry of Power, Government of India For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

ADB Supports Resilient Infrastructure Development in Eastern Thailand – EQ

In Short : The Asian Development Bank is supporting resilient infrastructure in Eastern Thailand’s Eastern Economic Corridor. Key projects include extending Intercity Motorway No. 7 and developing a 2,500 MW gas power plant in Rayong. These initiatives focus on climate resilience, energy security, and inclusive growth, aligning with Thailand’s sustainable development goals and boosting economic […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

VIABILITY GAP FUNDING FOR BATTERY ENERGY STORAGE SYSTEMS – EQ

In Short : India has approved Viability Gap Funding (VGF) to support the development of 4,000 MWh Battery Energy Storage Systems (BESS) by 2030-31. The initiative aims to enhance grid reliability, enable renewable energy integration, and make storage solutions commercially viable. VGF will reduce project costs, accelerating India’s transition towards a clean, sustainable, and energy-secure […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Biggest challenge for net-zero norms is energy storage systems: Report – EQ

In Short : A report highlights energy storage as the biggest challenge to achieving net-zero emissions. Battery Energy Storage Systems (BESS) must expand 35-fold by 2030 to support renewable energy. High costs and infrastructure needs hinder adoption. Long-Duration Energy Storage (LDES) offers a solution, but policy support and investment are crucial to ensuring grid stability […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ