Petition of the DERC (Net Metering for Renewable Energy) Regulations and (Peer to Peer Energy Transaction) Guidelines 2024 – EQ February 12, 2026 Anand Gupta 000 Policy & Regulation Summary: — ## 1. PETITION OVERVIEW **Petitioner**: BSES Rajdhani Power Ltd. (BRPL) **Filed On**: 16.01.2026 **Legal Basis**: Sections 86(1)(c), 86(1)(e), 86(1)(k) of Electricity Act, 2003; DERC Net Metering Regulations, 2014; DERC P2P Guidelines, 2024 **Primary Prayers**: – Guidance on alignment of DERC P2P Guidelines (2024) with UPERC P2P Guidelines (2023) – Approval of mechanism for […] Read more Petition for Adoption of Setting up of 600 MW ISTS-connected Wind Power Projects (Wind-2) in India – EQ
Petition of the DERC (Net Metering for Renewable Energy) Regulations and Commission (Peer to Peer Energy Transaction) Guidelines – EQ January 23, 2026 Anand Gupta 000 Policy & Regulation Summary: — ### **1. PETITION DETAILS** – **Petitioner:** BSES Rajdhani Power Ltd. – **Legal Basis:** Filed under **Sections 86(1)(c), 86(1)(e), and 86(1)(k)** of the Electricity Act, 2003, read with: – **Regulation 14** of the DERC (Net Metering for Renewable Energy) Regulations, 2014. – **DERC (Peer-to-Peer Energy Transaction) Guidelines 2024.** – **Nature:** Petition concerning a **pilot […] Read more Petition for Adoption of Setting up of 600 MW ISTS-connected Wind Power Projects (Wind-2) in India – EQ