1. Home
  2. Tag "Ess"

Petition for Adoption of tariff for 2000 MW ISTS Solar PV Power Projects with ESS and SECI-ISTS-XX of the Government of India – EQ

Summary: — ### **PETITION DETAILS** – **Petitioner:** Solar Energy Corporation of India Limited (SECI) – **Respondents:** Welspun Renewable Energy Private Limited & Others – **Subject:** Petition under **Section 63 of the Electricity Act, 2003** for adoption of tariff for **2000 MW Inter-State Transmission System (ISTS) Solar PV Power Projects** with **1000 MW / 4000 MWh […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination for “Transmission System associated with SEWA-II HEP” in the Northern Region – EQ

Petition for Adoption of Supply of 6000 MWh Assured Peak Power from ISTS- connected RE Power Projects with ESS anywhere in India – EQ

Summary: —- **1. Case Overview** – **Regulatory Body:** Central Electricity Regulatory Commission (CERC), New Delhi. – **Petition Number:** 31/AT/2026. – **Subject:** Petition under Section 63 of the Electricity Act, 2003 for adoption of tariff discovered through competitive bidding for supply of assured peak power from renewable energy projects with energy storage. – **Petitioner:** SJVN Limited […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination for “Transmission System associated with SEWA-II HEP” in the Northern Region – EQ

Petition for Approval to procure and sign Power Sale Agreement of 600 MW assured peak power from SJVN Ltd. 6000 MWh (1500 MW x 4 hrs) Renewable Energy Project with ESS – EQ

Summary: — ### **1. Executive Summary** The Delhi Electricity Regulatory Commission (DERC) has **admitted** Petition No. 78/2025 filed by BSES Rajdhani Power Ltd. (BRPL) during the hearing held on **02 January 2026**. The petition seeks approval to procure **600 MW of assured peak power** from SJVN Ltd.’s Renewable Energy Project with Energy Storage System (6000 […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination for “Transmission System associated with SEWA-II HEP” in the Northern Region – EQ

Petition of the Electricity Act for Procurement of Firm and Dispatchable Power from Grid connected Renewable Energy Power Projects with ESS – EQ

Summary: — #### 1. **Parties Involved** * **Regulatory Authority:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar. * **Petitioner:** Torrent Power Limited (TPL). * **Bench:** The order was passed by a two-member bench consisting of Members Mehul M. Gandhi and S. R. Pandey. #### 2. **Purpose of the Petition** TPL has filed this petition to seek two […]

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination for “Transmission System associated with SEWA-II HEP” in the Northern Region – EQ

Petition for Adoption of Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with ESS with “Greenshoe Option” – EQ

Petition for Adoption of Supply of 1200 MW Firm and Dispatchable Power (FDRE – 2) from ISTS-Connected RE Power Projects with ESS with “Greenshoe Option” For more information please see below link:

In the matter of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for Truing up and determination for “Transmission System associated with SEWA-II HEP” in the Northern Region – EQ

SJVN issue Tender for Selection of RE Power Developers For Supply of 6 GWh from ISTS-connected RE Power Projects with ESS anywhere in India under Tariff-Based Competitive Bidding – EQ

SJVN issue Tender for Selection of RE Power Developers For Supply of 6 GWh from ISTS-connected RE Power Projects with ESS anywhere in India under Tariff-Based Competitive Bidding For more information please see below link:

NTPC Ltd issue Tender for Development of Grid Connected Roof Top Solar Power Project at HCL Ghatsila – EQ

Bluetti Launches New Residential Energy Storage System EP2000 & B700 – EQ

Bluetti has launched the EP2000 & B700 residential energy storage system, designed to provide homeowners with a secure, cost-effective, and energy-efficient solution for complete power independence. With up to 20kW output power and 30kW of solar input capacity, the EP2000 enables homes to reach 100% energy self-sufficiency, making it ideal for those looking to maximize […]

Deye Integrated Energy Storage Solution Powering Reliable Off-Grid Applications in India – EQ