1. Home
  2. Tag "evacuation of power"

Petition for the determination of transmission tariff under Transmission System strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part F1 – EQ

Summary: —- **Subject of Petition:** Power Grid Corporation of India Limited (PGCIL) has filed a petition for **determination of transmission tariff** from the Date of Commercial Operation (DOCO) until **31 March 2024** for specific transmission assets under a **renewable energy evacuation scheme** in Rajasthan. **Assets Involved:** – **Substation:** 400kV Bikaner-II Pooling Station (PS) – extension […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for determination of the transmission tariff for evacuation of power from Solar Energy Zones in Rajasthan (8.1GW) under Phase-II-Part F1 – EQ

Summary: ### **1. Project Details** * [cite_start]**Petition No. 285/TT/2024:** This petition is for the determination of the transmission tariff from the Commercial Operation Date (COD) to March 31, 2024, for assets under the “Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1GW) under Phase-II-Part F1″[cite: 3, 4]. * [cite_start]**Petition […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

DVC issue Tender for evacuation of power from 228 MW Floating Solar PV and 100 MW / 400 MWH BESS at Konar – EQ

Summary: * **Work Title**: Establishment of **132KV(GIS)/33KV(AIS) solar pooling station** along with the construction of **132KV D/C LILO from BTPS-Konar-Barhi Line** for evacuation of power from **228 MW Floating Solar (FSPV) and 100MW/400MWH BESS at Konar**. * **Estimated Cost**: ₹ **113,16,93,937.20** (Excluding GST, including F\&I) * **Bid Security / EMD**: ₹ **1,13,16,939.00** * **Tender Dates**: […]

CPWD issue Tender for SITC of Rooftop solar system at NIEPMD Campus, Chennai – EQ

Petition for determination of the transmission tariff for the transmission assets under “Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in Rajasthan – EQ

Summary: — ## **Case Summary – PGCIL Transmission Tariff Petitions (Rajasthan Solar Evacuation Schemes)** **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi **Date of Hearing:** 26 August 2025 **Coram:** * Jishnu Barua, Chairperson * Ramesh Babu V., Member * Harish Dudani, Member * Ravinder Singh Dhillon, Member — ### **1. Petitions Covered** 1. **285/TT/2024** – […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for determination of transmission tariff for Evacuation of Power from Solar Energy Zones in the Northern Region – EQ

Petition for determination of transmission tariff for Evacuation of Power from Solar Energy Zones in the Northern Region Summary: — ### **Case Summary** * **Petitioner**: Power Grid Corporation of India Limited (PGCIL) * **Respondents**: Uttar Pradesh Power Corporation Limited and 14 others * **Petition Subject**: Determination of transmission tariff for the period 2024–29 for the […]

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for determination of the transmission tariff from the COD “Transmission System Strengthening Scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part F1” – EQ

Petition for determination of the transmission tariff from the COD “Transmission System Strengthening Scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part F1” For more information please see below link:

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for determination of the Transmission Tariff from the COD under “Transmission System strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part B1” – EQ

Petition for determination of the Transmission Tariff from the COD under “Transmission System strengthening scheme for evacuation of power from solar energy zones in Rajasthan (8.1GW) under Phase-II-Part B1” For more information please see below link:

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for Adoption of Transmission Charges with “Transmission system for evacuation of power from Rajasthan REZ Ph-IV – EQ

Petition for Adoption of Transmission Charges with “Transmission system for evacuation of power from Rajasthan REZ Ph-IV For more information please see below link:

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ

Petition for Adoption of Transmission Charges “Transmission system for evacuation of power from Rajasthan REZ Ph-IV” being established by Rajasthan IV 4B Power Transmission Limited – EQ

Petition for Adoption of Transmission Charges “Transmission system for evacuation of power from Rajasthan REZ Ph-IV” being established by Rajasthan IV 4B Power Transmission Limited For more information please see below link:

Petition for Truing up and determination of transmission tariff under Western Region System Strengthening Scheme (XVIII) in the Western Region – EQ