In Short : Torrent Power has invited bids for 200 MW of Firm and Dispatchable Renewable Energy (FDRE) with battery storage, plus a 100 MW greenshoe option. Open to solar, wind, or hybrid projects, the tender requires ISTS connectivity, strict performance criteria, and BIS-approved technologies. The 25-year PPA aims to boost reliable, renewable-based power supply […]