1. Home
  2. Tag "from Wind-Solar Hybrid Project with Energy storage technologies for Contracted Capacity of 600 MW with supply of 8.64 MU per day"

Procurement of Flexible, Schedulable Power on long-term basis i.e. 25 years, from Wind-Solar Hybrid Project with Energy storage technologies for Contracted Capacity of 600 MW with supply of 8.64 MU per day

Procurement of Flexible, Schedulable Power on long-term basis i.e. 25 years, from Wind-Solar Hybrid Project with Energy storage technologies for Contracted Capacity of 600 MW with supply of 8.64 MU per day For more information please see below link:

MES issue Tender for Special Repair to Solar Power Plant and Manning O&M for Solar Power Plant at Air Force Station Jaisalmer – EQ