Petition for Determination of Generic Levellised Tariffs for Small Hydro Projects above 100 kW for 4th Control Period (i.e. 01.10.2023 to 31.03.2027) – EQ November 20, 2023 Anand Gupta 000 Policy & Regulation Petition for Determination of Generic Levellised Tariffs for Small Hydro Projects above 100 kW for 4th Control Period (i.e. 01.10.2023 to 31.03.2027) For more information please see below link: Read more Petition of the Electricity Act for Adoption of transmission charges with Transmission System being established by Mundra I Transmission Limited – EQ