1. Home
  2. Tag "Green Energy Open Access"

Petition of the GERC (Terms and Conditions of Intra-State Open Access) and (Terms and Conditions for Green Energy Open Access) and (Conduct of Business), Regulations – EQ

Petition of the GERC (Terms and Conditions of Intra-State Open Access) and (Terms and Conditions for Green Energy Open Access) and (Conduct of Business), Regulations For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for seeking approval of the draft Procedure for Grant of Connectivity & Green Energy Open Access and draft Procedure for Grant of Connectivity on Intra-State Transmission or Distribution system – EQ

Petition for seeking approval of the draft Procedure for Grant of Connectivity & Green Energy Open Access and draft Procedure for Grant of Connectivity on Intra-State Transmission or Distribution system. For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ