Summary: — ## **Key Decisions by the Commission** ### **1. Tariff Adoption (Approved)** – The Commission **adopted the discovered tariffs** ranging from **₹3.35/kWh to ₹3.36/kWh** for the **1,200 MW** capacity. – **Reasoning:** The tariffs are lower than previously adopted tariffs for similar hybrid projects (₹3.43–₹3.46/kWh in Petition Nos. 268/AT/2024 and 402/AT/2024), reflecting competitive market conditions. […]
Summary: —- ### **Key Findings & Decisions by the Commission** 1. **Tariff Adoption (Modified):** – The Commission **adopted the discovered tariffs** but **reduced the total capacity** from 2,170 MW to **1,670 MW**. – **Reasoning:** Concern over the “Greenshoe Option” process lacking explicit provisions in the central guidelines, raising issues of transparency and equal treatment of […]
Summary: —- **1. Case Overview** This document is a Record of Proceedings (RoP) from the Central Electricity Regulatory Commission (CERC) regarding a petition filed by NHPC Limited. NHPC is seeking the Commission’s adoption of tariff for an additional 1150 MW of Firm & Despatchable renewable power. This capacity was procured under the “Greenshoe Option” from […]
Summary: — ## **1. Nature of Petition** Petition filed under **Section 63 of the Electricity Act, 2003** seeking: 🔹 **Adoption of tariff** for **1200 MW ISTS-connected Solar Power Projects** 🔹 With **600 MW / 2400 MWh Energy Storage System (ESS)** 🔹 Plus **additional 1200 MW under the “Greenshoe Option”** 🔹 Projects selected through competitive bidding […]
Summary: — ### **1. Document Overview** * **Document Type:** Record of Proceedings (RoP) * **Issued By:** Central Electricity Regulatory Commission (CERC), New Delhi * **Petition No.:** 735/AT/2025 * **Date of Hearing:** 16th October 2025 — ### **2. Subject Matter** **Petition under Section 63 of the Electricity Act, 2003** For **adoption of tariff** discovered through **Competitive […]
Summary: — ### **1. Background** **NTPC Limited (NTPCL)** filed a petition before the **Central Electricity Regulatory Commission (CERC)** under **Section 63 of the Electricity Act, 2003** seeking **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects**, with a **Greenshoe Option** for an additional capacity of up to **600 MW**. The projects are connected to […]