Petition of the Electricity Act of 200 MW firm and dispatchable renewable energy with Greenshoe option from Grid Connected RE Power Projects with ESS – EQ

Summary: —- ## Key Details at a Glance | Parameter | Details | |———–|———| | **Petition No.** | 10/2026 | | **Petitioner** | Tata Power Delhi Distribution Ltd. (TPDDL) | | **Project Type** | Firm and Dispatchable Renewable Energy (FDRE) with Energy Storage System (ESS) | | **Base Capacity** | 200 MW | | **Greenshoe […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for the Adoption of tariff for the supply of 1200 MW ISTS-Connected Solar PV Power Projects Anywhere in India with “Greenshoe Option” – EQ

Summary: — ## Key Business Information | Parameter | Detail | |———–|——–| | **Petitioner** | NTPC Limited | | **Total Tendered Capacity** | 1,200 MW | | **Greenshoe Option** | Up to 600 MW (not awarded) | | **Total Bids Received** | 1,020 MW from 6 bidders | | **Capacity Offered for Reverse Auction** | […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for Adoption of tariff of 1200 MW Wind-solar hybrid power projects with Greenshoe option to connected the Inter-State Transmission System of the Ministry of Power, Government of India from time to time – EQ

Summary: — ## **Key Decisions by the Commission** ### **1. Tariff Adoption (Approved)** – The Commission **adopted the discovered tariffs** ranging from **₹3.35/kWh to ₹3.36/kWh** for the **1,200 MW** capacity. – **Reasoning:** The tariffs are lower than previously adopted tariffs for similar hybrid projects (₹3.43–₹3.46/kWh in Petition Nos. 268/AT/2024 and 402/AT/2024), reflecting competitive market conditions. […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for Adoption of Tariff for the ISTS Grid connected Solar Power projects of 1200 MW with “Greenshoe Option” by Ministry of Power, Govt. of India (NHPC Tranche-IX) – EQ

Summary: —- ### **Key Findings & Decisions by the Commission** 1. **Tariff Adoption (Modified):** – The Commission **adopted the discovered tariffs** but **reduced the total capacity** from 2,170 MW to **1,670 MW**. – **Reasoning:** Concern over the “Greenshoe Option” process lacking explicit provisions in the central guidelines, raising issues of transparency and equal treatment of […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for Adoption for Despatchable Power under “Greenshoe Option” from ISTS connected RE Power Projects with ESS by Ministry of Power – EQ

Summary: —- **1. Case Overview** This document is a Record of Proceedings (RoP) from the Central Electricity Regulatory Commission (CERC) regarding a petition filed by NHPC Limited. NHPC is seeking the Commission’s adoption of tariff for an additional 1150 MW of Firm & Despatchable renewable power. This capacity was procured under the “Greenshoe Option” from […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for Adoption of ISTS Grid connected Solar Power projects of 1200 MW with Energy storage system (ESS) with “Greenshoe Option” (NHPC Tranche -VIII) – EQ

Summary: — ## 1. **Petition Overview & Relief Sought** NHPC filed this petition under **Section 63 of the Electricity Act, 2003** seeking: | **Prayer** | **Details** | |———–|————| | **Tariff Adoption** | Adoption of tariff discovered through competitive bidding for 1200 MW ISTS-connected Solar PV projects with 600 MW / 1200 MWh ESS | | […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for Adoption of Tariff for ISTS Grid connected Solar Power Projects of 1200 MW with 600 MW/2400 MWh ESS and with additional capacity with “Greenshoe Option” -EQ

Summary: — ## **1. Nature of Petition** Petition filed under **Section 63 of the Electricity Act, 2003** seeking: 🔹 **Adoption of tariff** for **1200 MW ISTS-connected Solar Power Projects** 🔹 With **600 MW / 2400 MWh Energy Storage System (ESS)** 🔹 Plus **additional 1200 MW under the “Greenshoe Option”** 🔹 Projects selected through competitive bidding […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for the Adoption of Tariff for Supply of 1200 MW ISTS-Connected Solar PV Power Projects with “Greenshoe Option” – EQ

Summary: — ### **1. Document Overview** * **Document Type:** Record of Proceedings (RoP) * **Issued By:** Central Electricity Regulatory Commission (CERC), New Delhi * **Petition No.:** 735/AT/2025 * **Date of Hearing:** 16th October 2025 — ### **2. Subject Matter** **Petition under Section 63 of the Electricity Act, 2003** For **adoption of tariff** discovered through **Competitive […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for Adoption of 1200 MW Wind-Solar Hybrid Power Projects with Greenshoe Option of the Ministry of Power, Government of India, as amended from time to time – EQ

Summary: — ### **1. Background** **NTPC Limited (NTPCL)** filed a petition before the **Central Electricity Regulatory Commission (CERC)** under **Section 63 of the Electricity Act, 2003** seeking **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects**, with a **Greenshoe Option** for an additional capacity of up to **600 MW**. The projects are connected to […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ

Petition for Adoption of 1200 MW Wind-Solar Hybrid Power Projects with Greenshoe Option of additional capacity to the ISTS for amended from time to time – EQ

Summary: — ## ⚖️ **Case Summary – CERC Petition No. 774/AT/2025** * **Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Date of Hearing:** 23 September 2025 * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member * Shri Ravinder Singh Dhillon – Member […]

In the matter of the DERC Comprehensive (Code of Conduct) Regulations, 2001 – EQ