1. Home
  2. Tag "Grid connected Power Projects"

Petition for determination of tariff of 16 MW Solar PV Grid connected Power Projects located at Mora, District Surat established by GSECL – EQ

Summary: —- **Core Matter:** This order pertains to a petition filed by the **Gujarat State Electricity Corporation Limited (GSECL)** against the **Gujarat Urja Vikas Nigam Limited (GUVNL)** . GSECL has approached the Commission seeking the **determination of tariff** for its 16 MW Solar Photovoltaic (PV) Grid-connected Power Projects located at Mora, District Surat. **Legal Basis:** […]

Petition of Adoption of tariff for approval of prefixed levelized tariff for PoP from Decentralize Ground / Stilt Mounted Grid Connected Solar ad PM-KUSUM scheme as per Government of Gujarat – EQ

Petition of the Electricity Act for determination of tariff of 30 MW Solar PV Grid connected Power Projects at Chandarava, District Botad – EQ

Summary: — ## **GUVNL vs. Essar Power Gujarat Limited** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2496 of 2025 **Order Date:** 05 August 2025 **Coram:** * S.R. Pandey, Member * Mehul M. Gandhi, Member — ### **1. Case Background** * **Petitioner:** Gujarat Urja Vikas Nigam Limited (GUVNL) * Represented by Adv. Mr. Utkarsh […]

Petition of Adoption of tariff for approval of prefixed levelized tariff for PoP from Decentralize Ground / Stilt Mounted Grid Connected Solar ad PM-KUSUM scheme as per Government of Gujarat – EQ