1. Home
  2. Tag "GRID-INDIA"

Grid India Proposes Full-Capacity T-GNA Scheduling with Enhanced Transmission Margins – EQ

In Short : Grid India has proposed amendments to CERC’s draft procedure for Temporary General Network Access (T-GNA) to enable power projects to schedule up to their full capacity by ensuring adequate transmission margins. The proposal includes mandatory RLDC registration for NOAR entities, bi-monthly clearance for deemed T-GNA, equitable treatment for renewable projects, and provisions […]

Tamil Nadu Achieves New Milestone in Solar Power Generation and Grid Absorption – EQ

Workforce Adequacy Guidelines for Load Despatch Centres and Guidelines for deputation of Workforce from SLDCs to Grid-India for fixed terms – EQ

Workforce Adequacy Guidelines for Load Despatch Centres and Guidelines for deputation of Workforce from SLDCs to Grid-India for fixed terms For more information please see below link:

Pre-bid meeting: RfS for Supply of 1000 MW Excess Power from RE Projects having Existing PPA (SECI-FDRE-VIII) – EQ

GRID-INDIA is now a Miniratna Company – EQ

In Short : GRID-INDIA has been designated as a Miniratna company, marking a significant milestone in its journey towards becoming a leading player in the energy sector. In Detail : Grid Controller of India Limited (GRID-INDIA) achieved a significant milestone by being conferred with the status of Miniratna Category-I Central Public Sector Enterprise (CPSE). This […]

Tamil Nadu Achieves New Milestone in Solar Power Generation and Grid Absorption – EQ

GRID-INDIA hosts Governing Board and Steering Board Meetings of Very Large Power Grid Operators’ Association GO15 – EQ

In Short : GRID-INDIA has hosted the Governing Board and Steering Board Meetings of the Very Large Power Grid Operators’ Association, GO15. This event likely facilitated discussions and collaboration among major global power grid operators, aiming to enhance the reliability and efficiency of large-scale power systems internationally. In Detail : Grid Controller of India, under […]

Pre-bid meeting: RfS for Supply of 1000 MW Excess Power from RE Projects having Existing PPA (SECI-FDRE-VIII) – EQ