RRCAT issue Tender for DSITC and integration of a grid-tied solar power plant at RRCAT, Indore – EQ

Summary: — ### **1. PROJECT OVERVIEW** | Item | Details | |——|———| | **Work Description** | Design, Supply, Installation, Testing, Commissioning & Integration of a **50 kWp grid-tied solar power plant** at RRCAT, Indore. | | **Estimated Cost** | ₹42,20,000/- | | **Completion Period** | **6 months (180 days)**, inclusive of rainy season. | | […]

NHPC Ltd issue Tender for Development of Power Evacuation Infrastructure for 1200 MW Jalaun Solar Park – EQ

DVC issue Tender for ETC of Floating System Arrangements including Balance Supply for the 10 MW(AC) Grid-Tied Floating Solar PV (FSPV) Plant at DVC RTPS, Raghunathpur – EQ

Summary: ### 📌 Tender Highlights (DVC) * **Scope of Work**: * Manufacture, supply, delivery, and installation of materials at site. * Design, engineering, construction, erection, testing & commissioning of floating solar system arrangements including civil works at Mejia Thermal Power Station (MTPS). * Supply of mandatory spares is also part of the contract. * **Eligibility**: […]

NHPC Ltd issue Tender for Development of Power Evacuation Infrastructure for 1200 MW Jalaun Solar Park – EQ

Growatt Solar Solutions Advance India’s Grid-Tied Home Energy Systems – EQ

As India races toward its 500 GW renewable energy target by 2030, residential rooftop solar has become pivotal in reducing power bills, cutting carbon emissions, and bolstering grid stability. Growatt’s next-generation MIC 1000~3300TL-X2 (Pro), MIN 4200~6000TL-X2 (Pro), MIN 4200~5000TL-X2 (Pro E) and MOD 7~15KTL3-X2 (Pro) inverters are engineered specifically for the Indian market, combining high […]

POWER DEMAND AND GENERATION CAPACITY – EQ