1. Home
  2. Tag "guidelines"

Petition of the DERC (Net Metering for Renewable Energy) Regulations and Commission (Peer to Peer Energy Transaction) Guidelines – EQ

Summary: — ### **1. PETITION DETAILS** – **Petitioner:** BSES Rajdhani Power Ltd. – **Legal Basis:** Filed under **Sections 86(1)(c), 86(1)(e), and 86(1)(k)** of the Electricity Act, 2003, read with: – **Regulation 14** of the DERC (Net Metering for Renewable Energy) Regulations, 2014. – **DERC (Peer-to-Peer Energy Transaction) Guidelines 2024.** – **Nature:** Petition concerning a **pilot […]

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Draft DERC (Group Net Metering and Virtual Net Metering for Renewable Energy) (Seventh Amendment) Guidelines, 2025 – EQ

Summary: — ### **1. ISSUING AUTHORITY & LEGAL BASIS** – **Issuing Body:** Delhi Electricity Regulatory Commission (DERC) – **Legal Authority:** – **Section 181, Section 61(h), and Section 86(1)(e)** of the **Electricity Act, 2003** (Act 36 of 2003) – **Regulation 14** of DERC (Net Metering for Renewable Energy) Regulations, 2014 – **Guideline 17** of DERC (Group […]

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

RVPN – Reactive Power Guidelines by RRECL – EQ

Summary: — #### **1. Case Overview** * **Petitioner:** **Power Grid Corporation of India Limited (PGCIL)** * **Subject:** The petition is a comprehensive request for tariff adjustments for specific transmission assets in the Northern Region across multiple control periods. It combines two petitions: 1. **Petition No. 482/TT/2019:** For assets related to the **Kishenpur-Moga transmission system**. 2. […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Amendment in Guidelines for Implementation of Awareness and Outreach component under PM Surya Ghar – EQ

Summary: — ## **1. Background** * The **PM-Surya Ghar: Muft Bijli Yojana** was approved on **29th February 2024**, with an **outlay of ₹75,021 crore** till FY **2026–27**. * The goal: installation of **1 crore rooftop solar systems** for **residential households**, empowering them to generate electricity and save costs. * Outlay includes **₹657 crore (1% of […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Operational Guidelines for EV Public Charging_PM-EDRIVE – EQ

Summary: — ## **1. Background** * The **PM E-DRIVE Scheme** (Electric Drive Revolution in Innovative Vehicle Enhancement) was approved with an **outlay of ₹10,900 crore** (Sept 2024). * One of its key objectives is to accelerate **EV adoption** by supporting **public charging infrastructure**. * The scheme earmarks **₹2,000 crore** specifically for EV Public Charging Stations […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

FAQs on Guidelines for series approval of SPV Modules for conducting testing in Test Labs for implementation of Solar Systems, Devices and Components Goods Order, 2025 – EQ

FAQs on Guidelines for series approval of SPV Modules for conducting testing in Test Labs for implementation of Solar Systems, Devices and Components Goods Order, 2025 For more information please see below link:

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Guidelines for enlistment under “Approved Models and Manufacturers of Solar Photovoltaic Modules (Requirements for Compulsory Registration) Order, 2019”: Amendment – reg. – EQ

Summary: — ## 📜 **Background** * On **27 January 2025**, the **Ministry of New and Renewable Energy (MNRE)** issued the *Solar Systems, Devices and Components Goods (Requirements for Compulsory Registration under BIS Act, 2016) Order, 2025*. * The order mandated that **five categories** of solar systems, devices, and components be registered under the **Bureau of […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Guidelines regarding metering for Low Tension Consumers willing to Open Access under MERC Green Energy Open Access Regulations – EQ

Summary: — ## 🏢 **Issuing Authority** * **Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL)** * Office of the **Chief Engineer (Commercial)** * **Circular No.**: 350 * **Date**: 07 August 2025 * **Reference**: MERC (Distribution Open Access) (Second Amendment) Regulations, 2023 – notified on 10 November 2023 — ## 📜 **Background** * MERC’s amended DOA regulation […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Revised Scheme Guidelines for setting up Hydrogen Valley Innovation Cluster (HVIC) and Green Hydrogen Hubs in India under National Green Hydrogen Mission (NGHM) – EQ

Revised Scheme Guidelines for setting up Hydrogen Valley Innovation Cluster (HVIC) and Green Hydrogen Hubs in India under National Green Hydrogen Mission (NGHM) For more information please see below link:

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ