1. Home
  2. Tag "Gujrat"

Juniper Green Energy commissions wind power project in Gujarat -EQ

  In  Short –  Juniper Green Energy successfully commissions a wind power project in Gujarat, marking a significant milestone in India’s renewable energy journey. This venture promises to contribute substantially to the region’s clean energy infrastructure and sustainability goals. In  Detail –  Juniper Green Energy has announced the commissioning of its maiden wind power project , contributing 70 MW to […]

Telangana’s Model Solar Villages Shine as Exemplars of Clean Energy Transformation – EQ

BHEL Issue Tender for O and M works of 100 MW Solar PV Power plant at GSECL, Raghanesda Solar Park Phase I Gujrat – EQ Mag Pro

BHEL Issue Tender for O and M works of 100 MW Solar PV Power plant at GSECL, Raghanesda Solar Park Phase I Gujrat. For more information please see below link:

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

GUVNL Issue Tender for Supply of m 500 MW RE projects with assured Peak power supply along with Energy Storage System (ESS) to be setup in Gujarat (Phase XV) – EQ Mag Pro

GUVNL Issue Tender for Supply of m 500 MW RE projects with assured Peak power supply along with Energy Storage System (ESS) to be setup in Gujarat (Phase XV). For more information please see below link:

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

Sabarkantha District Cooperative Milk Producers’ Union Issue Tender for Supply of 1 MW (DC) SOLAR ROOF TOP PHOTOVOLTAIC GRID-CONNECTED POWER PLANT AT SABAR DAIRY, HIAMMATNAGAR, GUJARAT – EQ Mag Pro

Sabarkantha District Cooperative Milk Producers’ Union Issue Tender for Supply of 1 MW (DC) SOLAR ROOF TOP PHOTOVOLTAIC GRID-CONNECTED POWER PLANT AT SABAR DAIRY, HIAMMATNAGAR, GUJARAT. For more information please see below link:

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

Hindustan Salts Limited Issue Tender For EXPRESSION OF INTEREST FOR DEVELOPMENT OF SOLAR PV PROJECT AT GUJRAT – EQ Mag Pro

Hindustan Salts Limited Issue Tender For EXPRESSION OF INTEREST FOR DEVELOPMENT OF SOLAR PV PROJECT AT GUJRAT. For more information please see below link:  

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

Petition for execution of the Transmission System for Evacuation of power from potential Solar and Wind Energy Zones in Gujarat (13.5GW) and Madhya Pradesh (4GW) – EQ Mag Pro

Petition for execution of the Transmission System for Evacuation of power from potential Solar and Wind Energy Zones in Gujarat (13.5GW) and Madhya Pradesh (4GW). For more information please see below link:

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Guj’s ‘Solar Capital’ Image May Take A Hit Over Subsidy Denial

State Finance Department Less Willing To Give Subsidy To Solar Power Producers, Leaving 4,000 MSME Units In Limbo And Jeopardising Investment Of Rs 1,000 Cr Already Made And Rs 10,000 Cr Proposed. After years of projecting Gujarat as the ‘solar capital’ of the country and stirring up investors into pouring hundreds of crores into the […]

Telangana’s Model Solar Villages Shine as Exemplars of Clean Energy Transformation – EQ

Supply of BOS items and Installation of 20MW Solar PV Power plant at NTPC Gandhar, Gujrat

  The last date for submission of bids is 10th November, 2020. Supply of Balance of System items and Installation and Commissioning of 20MW (AC) Solar Photovoltaic Grid-connected Power plant at NTPC Gandhar, Gujrat For more information please see below link:

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ