1. Home
  2. Tag "HPPC/DISCOMs"

IN THE MATTER OF: Detailed Operating Procedure for backing down of coal based unit (s) of the State Generating Stations having 100% installed capacity tied up HPPC/DISCOMs – EQ Mag Pro

IN THE MATTER OF: Detailed Operating Procedure for backing down of coal based unit (s) of the State Generating Stations having 100% installed capacity tied up HPPC/DISCOMs of Haryana and for IPPs as per provisions in PPA with HPPC/DISCOMs. For more information please see below link:

Petition for Adoption of Tariff of 1200 MW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India with “Green-Shoe Option” by Ministry of Power – EQ