1. Home
  2. Tag "Hydroelectric Power Station-III"

In the matter of: Revision of tariff of Teesta Low Dam Hydroelectric Power Station-III (132 MW)

  In the matter of: Revision of tariff of Teesta Low Dam Hydroelectric Power Station-III (132 MW) for the period from 1.4.2013 to 31.3.2014-Truing-up of tariff determined by Commission‟s order dated 22.1.2015 in Petition No. 115/GT/2013 For more information please see below link:

Draft KERC (Roadmap for Reducing Cross-Subsidy and Cross Subsidy Surcharge) Regulations, 2025 – EQ