In Short : The Subansiri Lower Hydroelectric Project is a 2,000-megawatt project located on the Subansiri River in Assam. It is a run-of-the-river project that will generate clean energy by utilizing the river flow without creating a large reservoir. Once completed, it is expected to be one of the largest hydroelectric projects in India. In […]
Environmental flow describes the quantity, timing, and quality of water flows required to sustain freshwater and estuarine ecosystems and the human livelihoods and wellbeing that depend on these ecosystems New Delhi: The National Green Tribunal has directed state pollution control boards to ensure the release of minimum water downstream by hydroelectric projects, saying business or […]
EPC Contract Package covering Design & Engineering Services, Civil and Hydro-Mechanical Works of Dhaulasidh HEP (66 MW) in Distt. Hamirpur and Kangra (Himachal Pradesh) For more information please see below link: Tender Number: DCB-CCD-DSHEP-427-01 Tender Title: EPC Contract Package covering Design & Engineering Services, Civil and Hydro-Mechanical Works of Dhaulasidh HEP (66 MW) in […]
In the matter of: Revision of tariff of Uri-II Hydroelectric Project (240 MW) for the period from 11.10.2013 to 31.3.2014-Truing up of tariff determined by Commission’s order dated 4.2.2016 in Petition No. 156/GT/2013 For more information please see below link: