1. Home
  2. Tag "INSTALLATION"

PROGRESS ON SMART METER INSTALLATION UNDER RDSS – EQ

In Short : India is making steady progress on smart meter installation under the Revamped Distribution Sector Scheme to modernise power distribution and improve efficiency. The initiative focuses on replacing conventional meters with smart systems to enhance billing accuracy, reduce losses, enable real-time monitoring, and empower consumers with better control over their electricity usage. In […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

HPCL issue Tender for Site Works for Solar Plant Installation – EQ

HPCL issue Tender for Site Works for Solar Plant Installation For more information please see below link: Tender Details : Tender Title : SITE WORKS FOR SOLAR PLANT INSTALLATION Tender Reference Number : 2500025102-HB-02891 Tender Type : Open/Advertised Tender Category : Works Product Category : Civil Works Product Sub-Category : Tender Fee * : 0 EMD * […]

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

NTPC Ltd issue Tender for Installation of Solar PV Modules at 10 MW Solar PV plant – EQ

Summary: —- **1. Bidding Process** – **Bidding Method**: Single Stage Single Envelope (Envelope-1 contains Techno-Commercial Bid & Price Bid) – **Bidding Type**: Domestic Competitive Bidding – **Portal**: Bids to be submitted via NTPC eProcurement Portal (https://eprocurentpc.nic.in) – **Key Dates**: As per eProcurement portal (no specific dates provided in document) **2. Contract Details** – **Contract Duration**: […]

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

CPWD issue Tender for Installation of Rooftop Solar Power Plants at IHM Gurdaspur – EQ

CPWD issue Tender for Installation of Rooftop Solar Power Plants at IHM Gurdaspur For more information please see below link: Tender Details : Tender Title : 88/EE(E)/JED/CPWD/2025-26(Revised) Tender Reference Number : 88/EE(E)/JED/CPWD/2025-26(Revised) Tender Type : Open/Advertised Tender Category : Works Product Category : Electrical Works Product Sub-Category : Tender Fee * : 0 EMD * : 141128 […]

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

Notice regarding Delay in Installation of SCADA based remote control system at IAF airfields – EQ

Summary: — # **Detailed Summary of MNRE Notice (Dated 11th December 2025)** The Ministry of New and Renewable Energy (MNRE), Wind Energy Division, issued an important notice emphasizing the urgent need for installing a **SCADA-based remote control system** at all Indian Air Force (IAF) airfields where wind turbine generators (WTGs) are operational. This directive follows […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

BHEL issue Tender for Installation of Rooftop Solar at BHEL Rudrapur under PMSMBY on RESCO Mode for 25 Yrs period – EQ

Summary: — ### **1. Document Details** * **Organization:** Bharat Heavy Electricals Limited (BHEL) * **Document Type:** Tender Notice * **File Name:** Tendernotice_1.pdf * **Date of Issue:** 16th October 2025 * **Issued By:** Vipul Kumar — ### **2. Purpose of the Document** * This document serves as an **official tender notice** issued by **BHEL**. * The […]

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

Minutes of the Meeting taken by Chairperson, CEA, on 03.09.2025 (Wednesday) at 12:30 PM to discuss issues related to Installation of Harmonic Filters in Renewable Energy Projects – EQ

Summary: — 1. COD/FTC approval will only be provided for projects with harmonic filters being installed even for those projects which are getting installed in parts. 2. FTC applications from IPP who are compliant to their undertaking given earlier or a fresh applicant IPP can go ahead with COD and install harmonic filters by 31st […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Saatvik Green Energy Limited receives Letter of Award (LoA) from Maharashtra State Electricity Distribution Company Limited (MSEDCL) for installation of 1500 Solar Water Pumps in Maharashtra – EQ

Gurugram, New Delhi – Saatvik Green Energy Limited has received Letter of Award (LoA) from Maharashtra State Electricity Distribution Company Limited (MSEDCL) for installation of 1,500 solar water pumping systems under the Magel Tyala Saur Krishi Pump Yojana (MTSKPY) / PM-Kusum – B Scheme (2025–2026). The project spans multiple districts across Maharashtra and will cover […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

CSL issue Tender for Supply and Installation of Solar Power Panel CMSRU – EQ

Summary: — ## **Cochin Shipyard Limited (CSL) – Tender Notice** ### 📌 Project Details * **Work Title:** Supply, Installation, Testing & Commissioning (SITC) of **1 MWp Rooftop Solar PV System** at CSL premises, Kochi. * **Tender No.:** CSL/RE/2025/SOLAR/01 * **Location:** Kochi, Kerala. * **Scope:** * Complete EPC work for rooftop solar system (1 MWp). * […]

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

Banaras Locomotive Works Advances Green Energy with Solar Panel Installation on Railway Tracks – EQ

In Short : Banaras Locomotive Works (BLW) has installed solar panels on railway tracks, reinforcing its commitment to green energy. The initiative aims to reduce carbon emissions and promote renewable energy use in operations. By integrating solar power, BLW supports Indian Railways’ vision of becoming a net-zero carbon emitter by 2030, while ensuring sustainable and […]

Telangana’s Model Solar Villages Shine as Exemplars of Clean Energy Transformation – EQ