1. Home
  2. Tag "JUSNL"

Petition for removal of difficulty in obtaining net metering facility at a connectivity level of 132 KV

  Petition purported to be filed Under Regulation A18 of JSERC (Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering) Regulations, 2015 for removal of difficulty in obtaining net metering facility at a connectivity level of 132 KV. We allow net metering connectivity of the petitioner for Solar power plant of 1998.8kW at 132 KV […]

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to KPS III HVDC Transmission Ltd – EQ