PM Modi to launch Kayamkulam NTPC floating solar plant on Saturday – EQ Mag Pro

The project is implemented at a cost of Rs 465 crore. A total of 2.16 lakh solar panels has been mounted on floaters. ALAPPUZHA : Prime Minister Narendra Modi will officially launch the 92MW floating solar plant of the National Thermal Power Corporation’s (NTPC) Rajiv Gandhi Combined Cycle Power Project at Kayamkulam at an online […]

Telangana’s Model Solar Villages Shine as Exemplars of Clean Energy Transformation – EQ

Supply of 3.3KV 1C x 400 sqmm DC Power Cables for 25MW (AC) NTPC SIMHADRI and 22MW (AC) KAYAMKULAM Floating Solar PV Projects

Supply of 3.3KV 1C x 400 sqmm DC Power Cables for 25MW (AC) NTPC SIMHADRI and 22MW (AC) KAYAMKULAM Floating Solar PV Projects. For more information click on below link : 

WBSEDCL issue Tender for Contractor for DEPSICTC including warrantee obligation, O&M for 12 years of a 100 MW (AC) Solar PV Power Plant and 25 MW / 100 MWh BESS – EQ

Petition – For determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants at RGCCP, Kerala

  Petition under Section 62 and 79 (1) (a) of the Electricity Act, 2003 read with CERC (Conduct of Business) Regulation, 1999 along with CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2017, for determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants in two phases […]

Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and determination of the transmission tariff with Tehri Transmission System in the Northern Region – EQ

Largest floating solar plants in the world to be installed at NTPC Kayamkulam in Kerala

India : Tata Power Solar, India’s largest integrated solar company and Tata Power’s wholly-owned subsidiary, post reverse auction of 105MWp Floating Solar Project, have received a Letter of Award to develop this project worth approx. Rs. 343 crores including 3 years O&M. This project is one of the most prominent floating solar projects in the […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ