Petition for seeking adoption of tariff discovered through E-DEEP portal of MSTCas per MOP guidelines for purchase of power up to 675 MW – EQ Mag Pro

Petition for seeking adoption of tariff discovered through E-DEEP portal of MSTCas per MOP guidelines for purchase of power up to 675 MW. For more information please see below link:

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Meeting of Parliamentary Consultative Committee attached to Ministry of Power held

The Meeting of Parliamentary Consultative Committee attached to the Ministry of Power was held in New Delhi today. Union Minister for Power and MNRE Shri R.K Singh chaired the meeting. Minister of State for Power and heavy industries Shri Krishan Pal Gurjar was also present in the meeting. Hon’ble Members of Parliament of various political […]

Strategies for Resilience – Ensuring Renewable Power Systems’ Readiness to Face Extreme Weather – EQ

POWERTHON-2022-Enabling Advanced Technologies in Power Distribution – EQ Mag Pro

POWERTHON-2022 Enabling Advanced Technologies in Power Distribution An Initiative under the Revamped Distribution Sector Scheme (RDSS) Currently the power distribution utilities in India face numerous challenges, that limited their ability to improve upon the AT&C loss level and ACoS-ARR gap. Lately a “Revamped Distribution Sector Scheme (RDSS)” has also been rolled out by the Ministry […]

Strategies for Resilience – Ensuring Renewable Power Systems’ Readiness to Face Extreme Weather – EQ

Steps taken by the Ministry of Power (MoP) and Central Electricity Authority (CEA) to ensure timely completion of Power Project – EQ Mag Pro

The current Installed Generation Capacity in the country is about 394 GW which is close to double the peak demand of 203 MW. The following action/steps are taken by the Ministry of Power (MoP)/Central Electricity Authority (CEA) to ensure timely completion of Power Projects: MoP/CEA monitor the progress of under-construction power projects through frequent site […]

Gujarat Launches Integrated Renewable Energy Policy 2025 to Boost Green Energy and Grid Stability – EQ

In the matter of according consent for relinquishment of power allocation from Ramagundam Super Thermal Power Station Stage I & II (358.37 MW) and Neyveli Thermal Power Station II Stage I & II (59.05 MW from Stage I and 105.95 MW from Stage II) – EQ Mag Pro

In the matter of according consent for relinquishment of power allocation from Ramagundam Super Thermal Power Station Stage I & II (358.37 MW) and Neyveli Thermal Power Station II Stage I & II (59.05 MW from Stage I and 105.95 MW from Stage II)  in terms of the guidelines issued by the Ministry of Power. […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Revised Policy for Mandatory Biomass Utilization in Thermal Power Plants issued by MOP dated 08.10.2021.

Revised Policy for Mandatory Biomass Utilization in Thermal Power Plants issued by MOP dated 08.10.2021.

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Regarding Provision of Gross Metering for Loads above Ten KW

Regarding provision of gross metering for loads above ten kW the “Rights of Consumers Rules 2020″notified by MoP, Gol Please find more information below.

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

In the matter of: TSERC (Demand Side Management) Regulations, 2020

  Commission invites suggestions/comments from all stake holders on TSERC (Demand Side Management) Regulations, 2020 on or before 14.10.2020 before 5 PM. For more information please see below link:

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ