Summary: — **Case Background:** The petitioner, **NERGS-I Power Transmission Limited (NREGSPTL)** , filed a petition seeking a transmission license from the Central Electricity Regulatory Commission (CERC). The license was required to develop and operate an Inter-State Transmission System (ISTS) under the “North Eastern Region Generation Scheme-I (NERGS-I)” project. **Key Development & Petitioner’s Position:** During the […]
Summary: — ## **1. Case Background** NERGS-I Power Transmission Limited (NREGSPTL) has filed a petition under: * **Sections 14, 15, and 79(1)(e)** of the Electricity Act, 2003 * **CERC Transmission Licence Regulations, 2009** seeking grant of a **Transmission Licence** for developing and operating an Inter-State Transmission System (ISTS) project. Respondents include **CTUIL** and beneficiary utilities […]
Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Limited For more information please see below link:
Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Limited For more information please see below link:
In the matter of with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Limited For more information please see below link:
Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Limited For more information please see below link: