In the matter of: Grant of interim tariff for Neyveli New Thermal Power Station (1000 MW) of NLC India Ltd January 30, 2020 Anand Gupta 0000 Policy & Regulation In the matter of: Grant of interim tariff for Neyveli New Thermal Power Station (1000 MW) of NLC India Ltd for the period from anticipated COD of Units-I & II to 31.3.2021 For more information please see below link: Read more Petition for Truing up and determination of transmission tariff under “Transmission System associated with CSA with CEPL and IBPL and IBPL LTOA Generation Projects in Tuticorin Area-Part-A” – EQ