Summary: —- **Project Details:** – **Bid Identification No.:** T-07/EE(Solar)/2025-26 – **Scope of Work:** Setting-up of a 16 MW/40 MWh Standalone Battery Energy Storage System (BESS) near Pathri Hydro Electric Project (HEP). – **Location:** District Haridwar, Uttarakhand. – **Model:** The project will be executed on a BOOT (Build, Own, Operate, and Transfer) basis. – **Scheme:** The […]
Summary: —- **Project Structure:** – **Scheme:** The project is to be developed under the Viability Gap Funding (VGF) scheme through the PSDF (Power Sector Development Fund). – **Model:** The projects will be executed on a BOOT (Build, Own, Operate, and Transfer) basis. – **Packages:** The total capacity is divided into three separate packages, each with […]
Summary: —- **Project Structure:** – **Scheme:** The project is to be developed under the Viability Gap Funding (VGF) scheme through the PSDF (Power Sector Development Fund). – **Model:** The projects will be executed on a BOOT (Build, Own, Operate, and Transfer) basis. – **Packages:** The total capacity is divided into three separate packages, each with […]