1. Home
  2. Tag "plans new despatch schedule"

NTPC plans to load cheaper power first, plans new despatch schedule

About half of NTPC’s 40.4 Gw coal-based installed capacity, generates power at Rs 3 or lower. The company will add a 5,000-Mw coal-based capacity this year NTPC, India’s largest thermal power producer, is planning a power despatch schedule wherein cheaper power will be loaded first. The move aims to reduce the cost of power for […]

MSEDCL Achieves Record Installation of 45,911 Solar Pumps in a Single Month – EQ