1. Home
  2. Tag "PM-KUSUM"

MEDA Issues EoI for Feasibility Survey and Technical Inspection of Solar Pumps Under PM KUSUM Scheme

Expression of Interest for Undertaking Third Party Survey for Solar Pump Site Feasibility and Technical Inspection or Verification of Installed Solar Pumps under PM Kusum Scheme Component B in the State of Maharashtra The last date to submit the bids is January 15, 2021 Maharashtra Energy Development Agency (MEDA) invites Expression of Interest (EOI) from […]

Supply of Hybrid Solar 50 Kwp Plant with Battery backup At SKUAST Kashmir

In the matter of Suo-Moto determination of pre-fixed levelised tariff under Component-A of PM-KUSUM Scheme

    In the matter of Suo-Moto determination of pre-fixed levelised tariff under Component-A of Pradhan Mantri Kisan Urja Suraksha Evam Utthan Mahabhiyan (PM-KUSUM) Scheme For more information please see below link:  

In the matter of: Petition of the Guidelines for Tariff Based Competitive Bidding Process notified by Ministry of Power 

RFP for Selection of Developers for Implementation of 100 MW Solar based power plants

  100 MW (AC) (Capacity may be increase subject to approval from MNRE) RFP for Selection of Developers for Implementation of 100 MW(AC) Grid Connected Solar based power plants connected to 33/11 kV substation for Sale of Solar Power to MPPMCL at various locations in the state of MP Request for Proposal (RFP) For Selection […]

Supply of Hybrid Solar 50 Kwp Plant with Battery backup At SKUAST Kashmir

MNRE issues Guidelines for Implementation of Feeder Level Solarisation under Component-C of PM-KUSUM Scheme

  Ministry of New and Renewable (MNRE), after consultation with state governments, has decided to issue Guidelines for Implementation of Feeder Level Solarisation under Component-C of PM-KUSUM Scheme. The Cabinet Committee on Economic Affairs had approved PM-KUSUM scheme in its meeting held on 19.2.2019. The Scheme consists of three components. The Component-A includes installation of […]

Electricity (Late Payment Surcharge) Rules, 2021

Tripura Regulator determines levelised tariff at Rs. 3.31 /kwh for a period of 25 years

In the Matter Of: Petition for determination of prefixed levelised tariff for purchase of Solar Power by Tripura State Electricity Corporation Limited from decentralized Solar Power Plants and other Renewable Energy Generating Plant of Farmer / Developer having capacity of 500 kw to 2000 kw in the vicinity of Rural grid Sub-Station under Component-A of […]

In the matter of: Petition of the Guidelines for Tariff Based Competitive Bidding Process notified by Ministry of Power 

NABARD, Agri Infra Fund Loans to be made available for PM-KUSUM scheme

PM-KUSUM or Pradhan Mantri Kisan Urja Suraksha evem Utthan Mahabhiyan Scheme is a flagship scheme of the central government to solarise agricultural areas and irrigation activities Giving a push to enhanced use of clean energy in the agriculture sector, the Union Minister for Power, New and Renewable Energy, R K Singh, said loans from NABARD […]

Siemens buys out C&S Electric for Rs 2,100 crore