1. Home
  2. Tag "POWERGRID Kudankulam Transmission Ltd"

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to POWERGRID Kudankulam Transmission Ltd – EQ

Summary: — ### Key Business & Legal Points #### 1. Transmission System Scope | Transmission Element | Scheduled COD | |———————|—————| | KNPP 3&4 – Tuticorin-II GIS PS 400 kV (quad) D/C line | December 31, 2026 | | 400 kV GIS line terminal equipment at Tuticorin-II GIS – 2 nos. | December 31, 2026 […]

In the matter for the Adoption of Transmission Charges to Transmission System by the SR WR Power Transmission Limited – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Transmission License to POWERGRID Kudankulam Transmission Ltd – EQ

Summary: — ### 1. Regulatory Authority * The proceedings are issued by the **Central Electricity Regulatory Commission (CERC)**, New Delhi. * CERC is the statutory authority responsible for regulation of inter-state electricity transmission and licensing. ### 2. Petition Details * **Petition Number:** 245/TL/2025 * The petition pertains to the **grant of a Transmission Licence**. ### […]

In the matter for the Adoption of Transmission Charges to Transmission System by the SR WR Power Transmission Limited – EQ