In the matter of: Revision of tariff of Pragati-III Combined Cycle Power Station (1371.2 MW) for the period from COD of GT-1 to 31.3.2014 after truing up exercise November 19, 2019 Anand Gupta 0000 Policy & Regulation In the matter of: Revision of tariff of Pragati-III Combined Cycle Power Station (1371.2 MW) for the period from COD of GT-1 to 31.3.2014 after truing up exercise For more information please see below link: Read more Petition of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing-up and determination of transmission tariff for the transmission system constructed – EQ