Petition of the GERC (Conduct of Business) Regulations for construction of the evacuation infrastructure and quashing of the letter – EQ

Summary: — ## Case Background * **Petitioner**: *Kintech Solarbikaner Pvt. Ltd.* – developer of a **50 MW Wind-Solar Hybrid captive project**. * **Respondent**: *Gujarat Energy Transmission Corporation (GETCO)*. * **Main Petition (No. 2535/2025)**: Sought **extension of time** for completion of evacuation infrastructure at **220 kV Rajula Substation** and quashing of GETCO’s warning letter (07.07.2025). * […]

Petition for the Adoption of tariff of 300 MW Wind Power Projects (Tranche XVIII) connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ

Petition of the GERC (Conduct of Business) Regulations for construction of the evacuation infrastructure and quashing of the letter – EQ

Summary: — ## **Daily Order – Petition No. 2513 of 2025** **Issued by:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Date of Order:** 04 August 2025 — ### **Case Title** **Petitioner / Applicant:** Tisza Solar Pvt. Ltd., Gurgaon, Haryana **Respondent:** Gujarat Energy Transmission Corporation Ltd. (GETCO), Vadodara **Interlocutory Application:** * **IA No. 57 of 2025** – […]

Petition for the Adoption of tariff of 300 MW Wind Power Projects (Tranche XVIII) connected to the ISTS of the Ministry of Power, Government of India as amended from time to time – EQ