Draft First Amendment to the TGERC (Terms and Conditions of Open Access), Regulation – EQ

Summary: —- **1. Regulation Overview** * **Purpose:** To amend the **TGERC (Terms and Conditions of Open Access) Regulation, 2024** (Principal Regulation No. 1 of 2024). * **Primary Driver:** To align the state regulation with the **Central Electricity Regulatory Commission (CERC) Procedure for Implementation of REC Mechanism 2024** and clarify the beneficiary of Renewable Energy Certificates […]

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Davanagere Power Transmission Ltd – EQ

TGERC (Licensees’ Duty for Supply of Electricity on Request) Draft Second Amendment Regulation, 2025 – EQ

Summary: **1. Regulation Overview** * **Purpose:** To amend the **Telangana Electricity Regulatory Commission (Licensee’s Duty for Supply of Electricity on Request) Regulation, 2013**. * **Primary Driver:** To align with the **Electricity (Rights of Consumers) Rules, 2020** (Ministry of Power) and address stakeholder concerns regarding Service Line Charges and the inspection/estimation process for new connections. * […]

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Davanagere Power Transmission Ltd – EQ

First Amendment to the APERC (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024) – EQ

Summary: — ## **1. Background and Purpose** The amendment is introduced to align the **Green Energy Open Access (GEOA) Regulation, 2024** (Regulation No. 3 of 2024) with the **Integrated Clean Energy (ICE) Policy, 2024** released by the Government of Andhra Pradesh on **16.10.2024**. **Key goals of ICE Policy 2024:** – Make Andhra Pradesh a leader […]

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Davanagere Power Transmission Ltd – EQ

Petition with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulation to NER Expansion Transmission Ltd – EQ

Summary: — ## ⚖️ **Document Overview** * **Issuing Authority:** *Central Electricity Regulatory Commission (CERC), New Delhi* * **Document Type:** *Record of Proceedings (RoP)* * **Petition Nos.:** 755/TL/2025 and 756/AT/2025 * **Date of Hearing:** *18 September 2025* * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani […]

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Davanagere Power Transmission Ltd – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulation for drawal of power by MPPTCL – EQ

Summary: — ## ⚖️ **Document Overview** * **Issuing Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Document Type:** Record of Proceedings (RoP) * **Petition No.:** 689/TL/2025 * **Date of Hearing:** *9 September 2025* * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member […]

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Davanagere Power Transmission Ltd – EQ

Petition of the GERC (Conduct of Business) Regulation of the evacuation infrastructure till the commissioning of the entire capacity of 40 MW of Wind Power Project – EQ

Summary: — # ⚖️ Case Details * **Forum:** GERC, Gandhinagar. * **Petition No.:** 2504 of 2025 + IA No. 52 of 2025. * **Petitioner:** *Sarjan Realties Pvt. Ltd.*, Pune. * Counsel: Ld. Adv. Aditya Singh. * **Respondent:** *Gujarat Energy Transmission Corp. Ltd. (GETCO)*. * Counsel: Ld. Adv. Aneesh Bajaj with Mr. Shobhraj Jayswal. * **Coram:** […]

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Davanagere Power Transmission Ltd – EQ

In the matter of Draft Sixth Amendment to the APERC (Licensees’ Standards of Performance) Regulation, 2004 – EQ

Summary: — ## 📌 Context * **Issuer:** Andhra Pradesh Electricity Regulatory Commission (APERC) * **Subject:** Draft **Sixth Amendment** to the *Licensees’ Standards of Performance Regulation, 2004* (Regulation No. 7 of 2004). * **Date of Notice:** 12th September 2025 * **Place:** Kurnool, Andhra Pradesh — ## ⚡ Key Details 1. **Draft Amendment Prepared:** * APERC has […]

India Marks Record-Breaking Year in Clean Energy in 2025 : Union Minister Pralhad Joshi – EQ

Petition for adoption of usage charges for 510 MW Solar Photovoltaic Power Station (Tranche-III) connected to the Inter-State Transmission System of Bidding Guidelines of MoP – EQ

Petition for adoption of usage charges for 510 MW Solar Photovoltaic Power Station (Tranche-III) connected to the Inter-State Transmission System of Bidding Guidelines of MoP For more information please see below link:

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Davanagere Power Transmission Ltd – EQ

Petition of the GERC (Procurement of Energy from Renewable Sources) (First Amendment) (Second Amendment) (Third Amendment) Regulations, 2022 – EQ

Petition of the GERC (Procurement of Energy from Renewable Sources) (First Amendment) (Second Amendment) (Third Amendment) Regulations, 2022 For more information please see below link:

In the matter with the CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to Davanagere Power Transmission Ltd – EQ