Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Summary: — ### **1. Basic Case Information** * **Petition No.:** 877/TT/2025 * **Date of Hearing:** December 3, 2025 * **Coram (Bench):** Shri Jishnu Barua (Chairperson), Shri Ramesh Babu V., Shri Harish Dudani, Shri Ravinder Singh Dhillon (Members) * **Petitioner:** **Power Grid Corporation of India Limited (PGCIL)** – The central transmission utility executing the project. * […]

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Limited – EQ

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to NERGS-I Power Transmission Limited – EQ

Summary: — ### **1. Basic Case Information** * **Petition No.:** 322/TL/2024 * **Date of Hearing:** December 3, 2025 * **Coram (Bench):** Shri Jishnu Barua (Chairperson), Shri Ramesh Babu V., Shri Harish Dudani, Shri Ravinder Singh Dhillon (Members) * **Petitioner:** **NERGS-I Power Transmission Limited (NREGSPTL)** – A Special Purpose Vehicle (SPV) likely set up to build, […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Summary: — ### **1. Case Details** – **Petition No.**: 771/AT/2025 – **Subject**: Petition under **Section 63 of the Electricity Act, 2003** for **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects** connected to the **inter-State Transmission System (ISTS)**, selected through competitive bidding. – **Petitioner**: **NTPC Limited** – **Respondents**: **Adani Renewable Energy Holding Twelve Limited […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Petition for Truing up and determination of the transmission tariff for Combined Asset under “North Eastern Region Strengthening Scheme-IV” in the North Eastern Region – EQ

Summary: — ### **1. Case Details** – **Hearing Date**: 27.11.2025 – **Bench**: Shri Ramesh Babu V. (Member) and Shri Harish Dudani (Member) – **Petitioner**: **Power Grid Corporation of India Limited (PGCIL)** – **Respondents**: Various state power distribution/management companies (e.g., MPPMCL, APDCL, etc.) — ### **2. Petitions Involved** Five separate petitions were heard together: | Petition […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Petition for determination of the Transmission Tariff for the Transmission Assets under Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in RJ – EQ

Summary: — ### **1. Case Details** – **Petition No.**: 80/TT/2025 – **Subject**: Determination of **Transmission Tariff** for assets under the **Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1 GW) under Phase-II-Part B1**. – **Petitioner**: **Power Grid Corporation of India Limited (PGCIL)** – **Respondents**: **Ajmer Vidyut Vitran Nigam Limited […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited – EQ

Summary: —- **KEY PROCEEDINGS:** 1. **Name Change of Petitioner:** – Petitioner’s representative informed the Commission that the process of changing the company’s name is ongoing. – Requested permission to file an affidavit with supporting documents regarding the name change. 2. **Commission’s Direction:** – Petitioner permitted to file an affidavit within **one week**, placing on record […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Petition of CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for determination of transmission tariff for 2014-19 tariff period – EQ

Summary: —- **BACKGROUND:** – **Remand Order:** Appellate Tribunal for Electricity (APTEL) remanded back CERC’s earlier order dated 29.6.2018. – **Reason for Remand:** APTEL directed re-determination of tariff based on: 1. Actual capital cost 2. Legitimate weighted average interest on loan (WAROI) 3. Grossed-up return on equity based on true effective tax rates 4. Correct useful […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

Petition for Truing up and determination of the transmission tariff for Double Circuit Purnea-Muzaffarpur and Muzaffarpur (PGCIL)-Muzaffarpur (BSEB) Transmission Line, in the Eastern Region and the Northern Region associated with Tala HEP of Powerlinks Transmission Limited – EQ

Summary: —- **KEY POINTS OF PROCEEDINGS:** 1. **Interim Application (IA 97/2025) – Allowed** • Petitioner’s application for amendment of prayers in Petition granted. • Amended petition taken on record; IA disposed of. 2. **Directions to Respondents** • Respondents granted **final opportunity** to file replies within **7 days** (copy to Petitioner). • Petitioner may file rejoinder […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

CSERC (Terms and conditions for determination of tariff for Renewable Energy sources) Regulations, 2025 – EQ

Summary: — 1. **Scope & Eligibility**: * Applies to RE projects achieving Commercial Operation Date (COD) between **1st April 2025 and 31st March 2030**, located within the state, and supplying their entire power to state distribution licensees on a long-term basis. * Defines eligibility criteria for various technologies: Wind, Small Hydro, Solar (PV, Thermal, Floating), […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ

CSERC (Terms and Conditions for determination of Multi-Year Tariff) Regulations, 2025 – EQ

Summary: —- **1. Scope of Application:** The Regulations apply to the following entities operating in Chhattisgarh: * State Transmission Utility * Generating companies (supplying power to distribution licensees in the state under long-term agreements, except stations under central jurisdiction and certain renewable energy stations) * All intra-state transmission licensees * All distribution licensees * State […]

Petition for the determination of transmission tariff for Establishment of Sub-station at Kurnool-III under “Transmission System for Kurnool Wind Energy Zone / Solar Energy Zone (AP)- Part-A & Part-B” in the Southern Region – EQ