Summary: — ### 🔹 IndianOil Tender (Tender No. PWJDT25028) **Project:** * Development of a **5 MW Solar Power Plant** at Village Rawra, Tehsil Bap, Phalodi, Rajasthan . * Includes design, supply, installation, testing, commissioning, and 12-month defect liability . **Scope of Work Highlights:** * Full EPC-type work (engineering, procurement, construction). * Must comply with technical […]
Summary: — #### **1. Project Overview** * **Scheme:** Part of the **”PM Surya Ghar: Muft Bijli Yojana”** for government buildings. * **Mode:** **RESCO/PPA Model**. The developer owns, operates, and maintains the plant and sells power to the government consumer. * **Scope:** Setting up of **cumulative 1555 KW** of grid-connected rooftop solar PV projects **without battery […]
Pre-bid meeting: RfS for setting up of 1000 kW Grid-Connected Rooftop Solar PV Projects on buildings of Rashtrapati Bhavan under RESCO mode (RTSPV-Tranche-III) This is in reference to the RfS for “Selection of Solar Project Developers for setting up of 1000 W Grid-Connected Rooftop Solar PV Projects on buildings of Rashtrapati Bhavan under ESCO mode […]
Summarya: — ## **Tender Summary – SJVN Ltd. (through SGEL)** **Tender No.:** SGEL/BD/1500 MW/RfS/0825 **Date of Issue:** 05 August 2025 **Organisation:** SJVN Green Energy Limited (SGEL), wholly owned subsidiary of SJVN Ltd. **Project:** Selection of **Solar Power Developers (SPDs)** for setting up **1,500 MW ISTS-connected Solar PV Power Projects** across India. — ### **1. Scope […]
Summary: — ## **RailTel Corporation of India Ltd – Tender Notice** ### 📌 Project Details * **Work Name:** EPC contract for **2.25 MW Solar PV Power Project** at **Railway Staff College, Vadodara (Gujarat)**. * **Scope:** * Full **Engineering, Procurement & Construction (EPC)** of a grid-connected 2.25 MW solar PV system. * Construction of transmission system […]
Summary: — ## 📌 Case Overview * **Petitioner:** SJVN Limited * **Respondents:** SECI, Distribution Companies (DISCOMs), CTUIL, and others. * **Subject:** Petition under Section 79(1)(b) & (f) of the Electricity Act, 2003 for **approval of tariff and adoption of discovered tariff** for Solar Power Projects. * **Capacity:** **100 MW (AC) Solar PV Project**. * **Location:** […]