1. Home
  2. Tag "Results"

Results : O&M contract including Insurance for Five Years of 10 MW Ground Mounted Solar Power Project at Badi Sid, Rajasthan – EQ

Summary: — ### **Document Title:** **Results — Operation & Maintenance (O&M) Contract Including Insurance for 5 Years of 10 MW Ground Mounted Solar Power Project at Badi Sid, Rajasthan** — ### **Issuing Authority:** **Solar Energy Corporation of India Ltd. (SECI)** **Tender No:** SECI/C&P/OP/11/019/2024-25 — ### **Purpose of the Tender:** The tender was issued for the […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Results : Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh – EQ

Summary: — ### **Document Title:** **Results — Balance of Systems Tender for Setting up of Grid Connected 200 MW Ground Mounted Solar PV Plant at Dhar, Madhya Pradesh** — ### **Issuing Authority:** **Solar Energy Corporation of India Ltd. (SECI)** **Tender No:** SECI/C&P/OP/11/017/2024-25 — ### **Purpose of the Tender:** The tender was issued for the **Balance […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Results : Tender for the Manufacturing, Testing, Packing and Forwarding, Supply and Transportation of 260 MWp Domestically Manufactured Solar PV Modules with Domestically Manufactured Solar Cells – EQ

Summary: — ### **Document Title:** **Results — Tender for Manufacturing, Testing, Packing, Forwarding, Supply and Transportation of 260 MWp Domestically Manufactured Solar PV Modules with Domestically Manufactured Solar Cells** — ### **Issuing Authority:** **Solar Energy Corporation of India Ltd. (SECI)** **Tender No:** SECI/C&P/OP/11/018/2024-25 — ### **Purpose of the Tender:** The tender was floated for the […]

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ

Advait Energy Transitions declares FY 2024-25 results – EQ

In Short : Advait Energy Transitions reported a 91% rise in FY 2024–25 revenue, reaching ₹399.11 crore, while net profit increased 46% to ₹32.05 crore. Q4 FY25 revenue surged 225.91% year-on-year to ₹194.67 crore, with net profit rising to ₹11.38 crore. The board proposed a final dividend of ₹1.75 per share, reflecting the company’s robust […]

Telangana’s Model Solar Villages Shine as Exemplars of Clean Energy Transformation – EQ

Results: Tender for The Manufacturing, Testing, Packing and Forwarding, Supply and Transportation of 400 MWp domestically manufactured Solar PV Modules with domestically manufactured Solar Cells – EQ

Results: Tender for The Manufacturing, Testing, Packing and Forwarding, Supply and Transportation of 400 MWp domestically manufactured Solar PV Modules with domestically manufactured Solar Cells For more information please see below link:

Sineng Electric Completes NGCP-Witnessed Grid Requirement Test for 99 MWp Tantangan Solar Project in the Philippines – EQ