Petition for determination of tariff of Rihand Super Thermal Power Station, Stage-III (1000 MW) NTPC Limited – EQ December 27, 2023 Anand Gupta 000 Policy & Regulation Petition for determination of tariff of Rihand Super Thermal Power Station, Stage-III (1000 MW) NTPC Limited For more information please see below link: Read more Petition of the CERC (Terms and Conditions of Tariff) Regulations for determination of tariff for the inter-state transmission lines for the 2024-29 tariff period – EQ