Petition for determination of tariff of Rihand Super Thermal Power Station, Stage-III (1000 MW) NTPC Limited – EQ December 27, 2023 Anand Gupta 000 Policy & Regulation Petition for determination of tariff of Rihand Super Thermal Power Station, Stage-III (1000 MW) NTPC Limited For more information please see below link: Read more Petition of the DERC (Net Metering for Renewable Energy) Regulations and Commission (Peer to Peer Energy Transaction) Guidelines – EQ