1. Home
  2. Tag "rooftop"

Rooftop and Open-Access Solar Drive India’s Shift Toward Domestic Cell and Wafer Manufacturing – EQ

In Short : Rooftop and open-access solar are driving India’s renewable energy growth to new heights. Rising demand for decentralized solar systems is shifting the industry focus from module assembly to domestic production of high-value solar cells and wafers. This move aims to strengthen local manufacturing, reduce import dependence, and support India’s clean energy expansion […]

NTPC Green Strengthens Renewable Portfolio with 158.4 MW Solar Commissioning in Andhra Pradesh – EQ

SJVN Ltd issue Tender for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects of Arunachal Pradesh under RESCO/PPA mode – EQ

Summary: — ## 📌 Case Overview * **Authority:** Military Engineer Services (MES) * **Tender Inviting Officer:** Garrison Engineer (East), Ranchi * **Work Title:** Provision of **50 kW Rooftop Solar Plant** at “Building No. P-6”, Ranchi * **Estimated Cost:** ₹39.80 lakhs (approx.) * **Completion Period:** 180 days * **Tender Document Cost:** ₹1,000/- (to be paid online) […]

NVVN issue Tender for Development of Grid Connected Roof Top Solar Power Project at Aiims Raipur and Bhopal – EQ

In the matter of Grid Interactive Rooftop PV solar Project commissioned of GERC Net Metering Regulations – EQ

Summary: — ## **Case Summary** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2466 of 2025 **Date of Order:** 21 July 2025 — ### **Parties** * **Petitioner:** Surya Roshni Ltd. *Represented by:* Mr. Kalpesh B. Ramjiyani & Mr. P.R. Thukral * **Respondent No. 1:** Paschim Gujarat Vij Company Ltd. (PGVCL) *Counsel:* Adv. Ms. Shrishty […]

In the matter of the CERC (Procedure, Terms and Conditions for grant of Trading license and other related matters) Regulations of Inter-State trading license in electricity from Category V to IV – EQ

Petition for MERC (Grid interactive rooftop renewable energy generating systems) (First Amendment) and (Distribution Open Access) (Second Amendment) Regulations, 2023 – EQ

Petition for MERC (Grid interactive rooftop renewable energy generating systems) (First Amendment) and (Distribution Open Access) (Second Amendment) Regulations, 2023 For more information please see below link:

In the matter of the CERC (Procedure, Terms and Conditions for grant of Trading license and other related matters) Regulations of Inter-State trading license in electricity from Category V to IV – EQ

CPWD issue Tender for SITC of Solar PV Power Generation System on Rooftop of Gpra Colonies at Gangtok, Sikkim – EQ

CPWD issue Tender for SITC of Solar PV Power Generation System on Rooftop of Gpra Colonies at Gangtok, Sikkim For more information please see below link: Tender Details : Tender Title : 04/EE (E)/SLG/CPWD/SILIGURI/20252026 Tender Reference Number : 04/EE (E)/SLG/CPWD/SILIGURI/20252026 Tender Type : Open/Advertised Tender Category : Works Product Category : Multi-crop Thresher Product Sub-Category […]

NVVN issue Tender for Development of Grid Connected Roof Top Solar Power Project at Aiims Raipur and Bhopal – EQ

SJVN issue Tender for RfS for Selection of SRPD for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects over the state of AP under RESCO/PPA mode through Tariff-Based Competitive Bidding PMSGMBY – EQ

SJVN issue Tender for RfS for Selection of SRPD for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects over the state of AP under RESCO/PPA mode through Tariff-Based Competitive Bidding PMSGMBY For more information please see below link:

NVVN issue Tender for Development of Grid Connected Roof Top Solar Power Project at Aiims Raipur and Bhopal – EQ

Strengthening Solar Supply Chains to Power India’s Dual Demand: Rooftop to Utility-Scale – EQ

In Short : Building a resilient solar supply chain is crucial to meeting both distributed and utility-scale energy demands. This involves scaling domestic manufacturing, securing raw materials, and streamlining logistics. Aligning supply with diverse deployment needs will ensure timely project execution, lower costs, and energy security—supporting India’s transition to a sustainable and self-reliant clean energy […]

KERC Proposes Draft Amendments to Electricity Supply Conditions, Seeks Public Feedback – EQ